November 2021

Electrical Construction & Maintenance: Volume 120, Issue 11
Cover Image

New Product Showcase: Motors, Drives, Motor Controls, and Power Distribution Equipment — November 2021

Nov. 15, 2021
Eight products designed with ease, efficiency, energy savings, and more in mind
House Lightningwebpromorgb

What the 2020 NEC Surge Protection Mandates Mean

Nov. 8, 2021
... and what still needs to be done.
Code Basics Promo Image 11 21

The Differences Between Grounding and Bonding – Part 11 of 12

Nov. 5, 2021
If you install “special equipment,” some Chapter 6 requirements add to the grounding and bonding requirements of Art. 250.
Promo Image Basic Training Fluke 11 21

Raise Your Power over Ethernet Comfort Level

Nov. 5, 2021
Knowing the ins and outs of this technology can help you seize new opportunities.

More content from November 2021

Photo 117291219 © One Photo | Dreamstime.com
Promo Image Market Watch 11 21 Dreamstime Xl 117291219

Using Aggregated Data to Analyze Specialty Contractor Performance

Nov. 4, 2021
Metrics provide an overall snapshot of the health of the industry, including how it pertains to specialty contractors.
© Dksamco | Dreamstime.com
Building On Fire Dreamstime Xl 40125564 Copy

Smoking Out the Main Causes of Electrical Fires

Nov. 4, 2021
An examination of why approximately 20% of structure fires reported to fire departments are classified as “electrical” in nature
Equipment lockout tags are used to indicate equipment should not be operated and is not in a safe condition for use.

Speaking the Same Language

Nov. 4, 2021
How electrical operations and maintenance professionals can effectively work with safety personnel
70 Ehb21 Ex 120 09

Changes to the 2021 NFPA 70E That Help Ensure Electrical Safety

Nov. 4, 2021
Elevating electrical safety to new heights
Promo Image Ecm Illustrated Catastrophes 1121

Illustrated Catastrophes: A Roadside Nightmare

Nov. 2, 2021
Take a look at the latest cringe-inducing electrical installations that readers submitted to NEC Consultant Russ LeBlanc.
November Wwh

What’s Wrong Here? Hint: Spectacular EMT Failure

Nov. 2, 2021
Think you can spot violations the original installer either ignored or couldn’t identify?
© Roman Motizov | Dreamstime.com
Estimating Promo Image Blueprints On Wood Desk Dreamstime Xl 68373710

The Importance of Contract Documents in an Estimate

Nov. 2, 2021
Become familiar with the documents that control every aspect of a project.
Image courtesy of Moxa
Moxa Promo Image Ec&m Pq Corner 11 21

Connectivity Tips for Switchgear and UPS PQ Monitoring

Oct. 21, 2021
To ensure a stable power supply, monitor power quality so that electrical devices are protected from unwanted interruptions and damaging fluctuations.
© Pixattitude | Dreamstime.com
Injured Worker Dreamstime Xl 40796957 Copy

Sobering Stats for Electrical Contractor Workers’ Comp Claims

Sept. 30, 2021
A leading insurer’s long-time study of group claims places electrical contractors second highest on its list.