LEED v4 Increases Technical Rigor with Advanced Energy Metering, BAS Integration & Data Sharing

Oct. 14, 2014
Facility Managers Turn to Smart Meters to Comply with LEED v4 With the introduction of LEED v4, facility managers face tougher metering requirements. In response, they are turning to advanced energy "smart meters" to easily access more granular energy data when measuring and verifying their building's energy consumption.

Facility Managers Turn to Smart Meters to Comply with LEED v4

With the introduction of LEED v4, facility managers face tougher metering requirements. In response, they are turning to advanced energy "smart meters" to easily access more granular energy data when measuring and verifying their building's energy consumption.

As a scalable, easily installed data acquisition solution to help identify saving opportunities over the course of the facility's operational lifetime, submeters easily justify their installed cost as essential elements of the increasingly rigorous - and on-going - M & V process at the heart of today's evolving green building rating systems.

This whitepaper presents an overview of LEED v4 and describes a cost-effective submetering solution that helps building operators improve energy efficiency.

Whitepaper topics include: 

  • LEED v4 Debuts Advanced Metering Requirements
  • Advanced Metering Capability of LEED v4's Tougher Technical Requirements
  • Energy Monitoring is Worth the Investment

Download "LEED v4Increases Technical Rigor with Advanced Energy Metering, BAS Integration & Data Sharing" here

sponsored by: 

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Don't Let Burn-Through Threaten Another Data Center or Utility Project

Get the No Burn-Through Elbow eGuide to learn many reasons why Champion Fiberglass elbows will enhance your data center and utility projects today.

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.