How to Thrive in a Tough Economy

March 1, 2012
Practical tips for making money and satisfying the customer during tough economic times

It’s no secret that times are tough for everyone involved in the construction industry — and have been for some time. Although it’s hard to find a silver lining amid such economic instability, there are still projects to be won, profits to be made, and businesses to grow for electrical contractors. It’s true, the total construction market dropped by more than 40% in recent years, compared with the good old days of 2005 to 2008. However, the good news is — that still leaves 60% of the market available for the taking. To win jobs during an economic downturn, what many people don’t know is they must adjust their operational theory, shifting priorities in support of the following areas: transferring value to the customer; increasing job productivity; reducing error and rework; segregating fixed cost from variable cost; and taking care of your people. Let’s take a look at each of these propositions more closely.

Transferring Value to the Customer

Remember in a tough economy your customers are dealing with cash flow problems and reduced profits just like you are. What they want is to start generating revenue again as fast as they can. The construction process is nothing more than a nuisance for many owners and customers. They simply want you to finish the building on time (or earlier) with no punch-list — at or below budget. The sooner you accept and understand your customer’s perspective, the sooner you can deliver the project. This might seem like a monumental undertaking; however, this same need exists whether the economy is good or bad.

Increasing Job Productivity

Your focus on productivity has to shift from individual productivity to job productivity. The difference between the two is simple. An individual electrician can be very productive, but if he can’t get to the work to do the installation, he is not producing. In other words, everything you do in the company has to focus on making sure that the skilled trade does one thing and one thing only — installation work. Any other activities, such as handling material, receiving goods, returning items, removing garbage, and cleaning up (Photo), have to be identified and passed on to lower, unskilled labor.

As you can see in Fig. 1 (click here to see Fig. 1), the majority of an electricians’ time is typically spent on activities other than installation work. If this could be reduced, the electrician’s individual “production rate” could actually slow down, and the job would still be more productive.

By using prefabrication techniques and asking vendors to place the material when, where, and how it is needed on the job, productivity levels will increase. Planning the job will help reduce the unexpected issues and clarify crew assignments. Our research has shown that every hour spent on planning will help save 17 hours at the end of the job.

Reducing Errors and Rework

One of the most important contributors to improved job productivity is the reduction of errors and rework. You can only achieve this goal by knowing what it is that labor is working on at any given time and how you can avoid the obstacles that might present themselves. The main reason for rework and error are miscommunications between supervisors and electricians as well as between the general contractor and subcontractors. By creating a simple and routine communication channel, you can avoid many of these issues.

One of the tools developed over the last 15 years — short interval scheduling® — has been explained in earlier EC&M articles (“The Secret to Short Interval Scheduling,” February 2009, and “The Agile Construction Advantage,” October 2006). Using this tool will help improve the communication of obstacles. Reducing rework is another means of squeezing dollars out of the project during both good times and bad. During the good times, gaining more-than-anticipated installation time is always a plus. During the bad times, it is a “must,” because the extra buffers are now gone.

Segregating Fixed Cost from Variable Cost

This task is much simpler than it sounds. First, you have to realize that during poor economic times, the competitive pressure of the construction market forces contractors to take on projects at lower-than-usual gross margins. This practice has a few disadvantages:

  • Negative impact on cash flow.
  • Reduced net profits.
  • In larger jobs, the more productive labor may be tied up for a longer period of time, making their availability more scarce when the economy comes back on the more profitable jobs.
  • Negative impact on bonding.

The historical approach to respond to this pressure is based on a cost-based pricing model, which assumes unchangeable labor units for the project completion. In other words, the low margins are achieved by cutting the profit from the top, assuming the labor units cannot be adjusted. Best-case scenario, labor units are cut across-the-board to have a competitive estimate, without any knowledge of where these cuts would come from for the job to actually perform profitably.

Continue to Page 2

The alternative approach is based on price-based costing (PBC), coined by management guru Peter Drucker, which focuses on the improvement of elements of the cost drivers, such as labor productivity, cost of money, and cash-flow during these times. PBC will ensure a higher net profit under the tough economic market environment by focusing on the internal and job specific cost drivers. In this model, the selling price is set by the customer and the market, and the expected return in the form of profit is fixed. From here, the cost of operations needed to complete the project is identified and worked on for better-than-estimated profits. See Fig. 2 (click here to see Fig. 2) for a comparison of these two models. If you want to be a profitable and competitive PBC contractor, you need to know the cost drivers of various activities and learn how to manage them.

A contractor’s bottom line is driven by its negotiation skills and ability to manage and contain costs. You must be able to clearly identify cost drivers and opportunities for their improvement. With this in mind, you must make strategic and tactical decisions on where to make cuts in the estimating and project production phases of the project, all while having confidence that these cuts are feasible and will not arbitrarily require you to give up your gross margins.

The fixed cost of the company has to be separated from its variable cost. Many contractors believe that if they allocate their fixed cost to the jobs, the jobs will carry them. This can only work if the fixed cost can be reduced accordingly with the reduced revenue payoff.

For example, let’s say a contractor has an accountant that is fully engaged when the company has annual revenue of $10 million. Naturally, this person’s hours will now be allocated across whatever jobs still remain in the mix. This will drive up the cost of these remaining jobs. This person can only be considered as a variable cost if you can reduce his hours or reduce the portion allocated. Otherwise, he is a fixed cost and needs to be recognized as such.

Taking Care of Your People

Typically, the very first thing contractors do when the going gets tough is take away perks from their employees, such as trucks and gas cards. If the fixed and variable costs are segregated correctly, trucks and gas are going to be a smaller part of the overhead cost when the volume drops. However, the people who made the company money during the good times should not be punished during the tough times. A contractor has to have a war chest for the bad economic times to take care of its people.

The paradox is that this war chest can only be built if, in the good times, the same principles outlined in this article are followed, and the extra profits are stored in this chest. If a contractor made a few million dollars during the good times, for example, a portion of this amount should go into some kind of savings account to make sure its loyal and diligent employees do not suffer during the bad times.

If everyone else is cutting their cost by getting rid of trucks, can you imagine how proud your labor force will be if they are driving to work with their shiny trucks every day? That is the best marketing and advertising campaign you can ever embark on — by letting your customers know that you will take care of them like you take care of your people.

By allocating costs correctly, taking care of employees, increasing job productivity, and reducing rework and obstacles on jobs, an electrical contractor can make money in a tough economy and add extra profits to the bottom line in a good one. These practices are not just self serving. They will also prove to your customers that you’re not only business savvy but also cognizant of the value an electrician’s skill and effort brings into a building’s electrical systems. This transfer of value is done most optimally when people are taken care of and the focus is on transferring this value with minimal losses and friction.

Dr. Perry is president and CEO of MCA, Inc., Flint, Mich. Moore is an associate implementer. They can be reached at: [email protected] and [email protected].

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Latest from Business Management

ID 335485132 © Imaginiac . | Dreamstime.com
The Top 5 Electrical and Construction Industry Trends for 2025
In the typical facility, the plant manager has X amount of discretionary spending power that can be directed toward a single purchase. At each level of management down, discretionary spending is stepped down into smaller amounts. Anything beyond a given manager’s limit must be appealed to the next level up. For example, the Plant Engineer can’t quite swing a purchase of $5200 but the Plant Manager can approve it. This informal arrangement reduces corporate overhead and improves operational efficiency. It does not address whether the spending decisions would make financial sense to the Chief Financial Officer, but the cap at each level keeps any mistakes to a reasonably acceptable loss or misallocation of resources. Beyond the Plant Manager’s limit, there is usually a formal process for getting spending approval. It typically involves filling out a Capital Request (or similarly named form). In well-run companies, the form is very structured. It mostly wants some basic information that will give the reviewer(s) the ability to justify not just the purchase but also the cost of acquiring the capital to do so. Because the funds will typically be borrowed by the corporation, the cost of capital must be balanced against the return on investment. There will be at least one person crunching the numbers to make what is called “the business case” for the proposed spending. Making the business case is something you should do, in some way or another, when considering spending within your approved limits. If the spending is above your approved limits, then the manager above you will need a bit beefier of a business case. The business case must take into account the value obtained versus the money spent. Consider the purchase of a thermographic camera. If you intend to purchase a mid-range camera but nobody at your facility is trained and certified in its use, the purchase is probably a waste of money. You’d be better off getting an entry-level camera and then arranging for a path toward certification if you intend to have that ability in-house and it makes operational and financial sense to do so. And generally, it makes sense to have a person or two with Level I certification so they really understand how to get the most out of a camera system that’s beyond the basic level. On the other hand, if you were a manager at an electrical testing firm with several Level III Thermographers you would be wasting your thermographers if you decided to “save money” by equipping them with only basic or even intermediate camera systems. Your firm needs to be able to troubleshoot problems when that important client calls in a panic. Your thermographers need the tools to do that job, and “cost-saving” on camera systems won’t cut it. Presumably, your clients are smart enough to already have basic camera systems; they just don’t have the expertise to use advanced systems. Sometimes a different logic applies to other types of test equipment. In the typical plant, maintenance electricians need sophisticated DMMs. If they lack the training to use the features that are needed for most effectively keeping equipment running, simply choosing a less capable DMM they already know how to use is not the answer. They need the appropriate DMM along with the training on how to use those features correctly. So far, we haven’t looked at the need to crunch any numbers to make the business case. What we have done is think about the match between the purchase, the problem that needs to be solved, and the ability of the user to solve the problem using that purchase. This sounds like a common sense approach that everyone would naturally take, but people often lose sight of the reason for the purchase in the first place. The tendency is to either go all out on something they can’t use or don’t need, or to “save money” by shortchanging the end users with something that doesn’t allow them to do what they need to do. What about those numbers? When you do a purchase request, a bean counter is going to try to determine the cash flows involved (typically in monthly periods). If you write something like, “The payback period is three years,” they don’t find that helpful. Lenders care that a loan can be serviced, and cash flow is the critical factor in calculating whether it can. Thus, beancounters don’t use payback to determine whether they can afford to borrow. They use the Internal Rate of Return (IRR) or Modified Internal Rate of Return (MIRR). Formulas for both IRR and MIRR have been in spreadsheet programs for over two decades, but before that they were determined using a Business Math Calculator (about $150 in 1990). And before that, they were laboriously calculated by hand. The cash flows that are charted will be either additional revenue generated or losses prevented. To help the person who figuratively wears the green eye shade, tie the use of the test equipment to a revenue stream. A major appliance plant in Tennessee has several production lines that collectively produce $1,560,000 per hour of revenue. Thus each minute of unplanned downtime is quite costly. If the plant electrical engineer there wanted to upgrade test equipment in a way that exceeds the Plant Manager’s spending authority, he needs to help the green eye shade guy do the math. He can cite short case histories from the past two years and briefly explain how having X capability (present in the new equipment, absent in the existing equipment) would have saved Y minutes of downtime (which the green eye shade guy will calculate out in terms of revenue and cash flow). The green eye shade guy also needs to know whether each case history is a one-off that will never recur or if it’s representative of what to expect in the future. You can settle this question with a brief explanation. For example, “The responding technician did not have a [name of test equipment]. Consequently, he had to arrive at the same conclusion by other means to the tune of 24 minutes of downtime he would not have incurred if he’d had a [name of test equipment]. This problem occurred once on Line 2 and twice on Line 4.” Now the green eye shade guy can simply add up the downtime, monetize it, and create the cash flow analysis. And it’s really good for something like a power monitor. For example, “In this particular case the plant did not have a monitoring system capable of detecting short-term bursts of power, which we call transient spikes, and alerting us. Transients happen with no notice, and usually without being detected. The motor shop forensic report shows the main motor failed due to winding insulation failure caused by transients. With a power monitor detecting and reporting those transients, we would have been able to intervene before outright failure, on a scheduled basis. That would have reduced downtime by 57 minutes twice last year alone.” Making the business case for your smaller purchases means simply thinking about what you are trying to accomplish and then making sure you are spending the funds correctly to achieve that goal. But as you go up the food chain, you need to make the picture more clear. And when you appeal to corporate for approval, you need to provide reasonably accurate downtime savings numbers that can be converted by them to revenue loss prevention in specific dollar amounts.
Man staring at wall with hand-drawn question marks and money bags on it

Sponsored