Ecmweb 4812 510ecm15pic1
Ecmweb 4812 510ecm15pic1
Ecmweb 4812 510ecm15pic1
Ecmweb 4812 510ecm15pic1
Ecmweb 4812 510ecm15pic1

What's Wrong Here?

Oct. 1, 2005
Hint: Is that one of those new “slim line” fuses?

How well do you know the Code? Think you can spot violations the original installer either ignored or couldn't identify? Here's your chance to moonlight as an electrical inspector and second-guess someone else's work from the safety of your living room or office. Joe Tedesco, who has a knack for finding shoddy electrical work, did the dirty work and found this mess. Now it's your turn to identify the violation.

Find the Answer

Answer:

Is this the work of a plumber or an electrician? One thing's for sure, based on the number of Code violations identified by this month's winners, whoever did this should be banned from performing any future electrical work.

Scott Newens, electrical engineer, U.S. Bureau of Reclamation, Sacramento, Calif., pointed out several key violations. “The 10 penny nails bypass the electric meter. The white PVC water pipe is also outside its designed usage. The white band between the two blue bands at the top of the bend suggests the joint seal has failed, which may explain the rust and moisture in the bottom of the fuse box. With 180° of bend at the top feed of the panel, the conduit run may be in violation of 362.26, which stipulates not more than 360° of total bend in a run. The panel to the left appears to be mounted backward with the door facing the wall. This is a violation of 110.26.”

Michael Beauvais, electrical technician, A.T. Cross Co., Lincoln, R.I., had this to say. “What really sticks out is the expert plumbing work that was done on the service meter. This is first-rate work. Too bad they used their skills on an electrical job. You can't use plumbing supplies for electrical work. This is a violation of 110.2 and 110.3. These sections of the Code would also apply to the jumpers they used to bypass the meter.”

Matt Houchin, electrician, IBEW Local 481, Shelbyville, Ind., added this to the mix. “The 30 inches of working space required by 110.26(A)(2) is encroached on. The nails cannot be used as a bypass for an electric meter. The ‘conduit’ is most likely not listed as required for this use, as per 352.6. Lastly, the installation provides no path for ground fault current, which violates the requirements of 250.4(A)(1 through 5).”

> Try Another Quiz

About the Author

Joe Tedesco

Tedesco served the industry in many roles during his career. He was a director, senior electrical code instructor for National Technology Transfer, Inc. and American Trainco, Inc.. He was also a codes, standards and seminar specialist for the International Association of Electrical Inspectors and an electrical field service specialist for the National Fire Protection Association in Quincy, Mass. He ran his own business as an NEC consultant and is a Massachusetts licensed master electrician and journeyman electrician and certified electrical inspector (one and two family 2A; General 2B, and Plan Review, 2C). Tedesco also wrote articles for CEE News and EC&M (Code Violations Illustrated and What's Wrong Here?) for more than 15 years and helped launched the Moving Violations video series.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Fiberglass Electrical Conduit Chemical Resistance Chart

This information is provided solely as a guide since it is impossible to anticipate all individual site conditions. For specific applications which are not covered in this guide...

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.