Ecmweb 4627 109ecmwwhpic1
Ecmweb 4627 109ecmwwhpic1
Ecmweb 4627 109ecmwwhpic1
Ecmweb 4627 109ecmwwhpic1
Ecmweb 4627 109ecmwwhpic1

What’s Wrong Here?, September 2011

Sept. 21, 2011
Can you identify the Code violation(s) in this photo?

Can you identify the Code violation(s) in this photo?

Hint: Is this a new type of cable insulation?

Find the Answer

How well do you know the Code? Think you can spot violations the original installer either ignored or couldn’t identify? Here’s your chance to moonlight as an electrical inspector and second-guess someone else’s work from the safety of your living room or office. Can you identify the Code violation(s) in this photo?

‘Tell Them What They’ve Won...’

Using the 2011 NEC, correctly identify the Code sections that show violation(s) in this month’s photo — in 200 words or less — and you could win something to put in your tool­box. E-mail your response to [email protected], and we’ll select three winners (excluding manufacturers and prior winners) at random from the correct submissions. Winners will receive a set of insulated hand tools from Ideal Industries, Inc., valued at more than $125.* The set includes 9.25-in. insulated side-cutting pliers, 10-in. insulated tongue-and-groove pliers, and a 0.25-in. 3 6-in. insulated screwdriver. (* Please allow six to eight weeks for delivery of tools.)

JULY WINNERS

We had two winners this month: Ray Keith, construction manager, Electric Motor Shop, Fresno, Calif., and Bill Hillebrand, partner GM, Romanoff Electric Louisville, Louisville, Ky. Both men noted a number of violations with this outdoor control station.

The circular opening in the side of the metal enclosure violates the requirements of 110.12(A). Unused openings shall be closed to afford protection equivalent to the wall of the equipment. The same type of requirement is also noted in Sec. 312.5(A) of the Code.

Based on all the dents and scrapes visible on the cover over the enclosure, the proper physical protection of the equipment can be questioned. Speaking of this cover, it appears to be a homemade unit. Maybe the installer was trying to secure a NEMA 3 rating for this installation.

The unprotected flexible cords and cables also violate the requirements of 400.8(7). They are clearly subject to physical damage. In addition, many of the conduits are unsupported.

Lastly, the lack of proper working clearance in front of the disconnect violates the requirements of 110.26.

About the Author

Joe Tedesco

Tedesco served the industry in many roles during his career. He was a director, senior electrical code instructor for National Technology Transfer, Inc. and American Trainco, Inc.. He was also a codes, standards and seminar specialist for the International Association of Electrical Inspectors and an electrical field service specialist for the National Fire Protection Association in Quincy, Mass. He ran his own business as an NEC consultant and is a Massachusetts licensed master electrician and journeyman electrician and certified electrical inspector (one and two family 2A; General 2B, and Plan Review, 2C). Tedesco also wrote articles for CEE News and EC&M (Code Violations Illustrated and What's Wrong Here?) for more than 15 years and helped launched the Moving Violations video series.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Don't Let Burn-Through Threaten Another Data Center or Utility Project

Get the No Burn-Through Elbow eGuide to learn many reasons why Champion Fiberglass elbows will enhance your data center and utility projects today.

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.