What’s Wrong Here? February 2011

Feb. 23, 2011
Can you identify the Code violation(s) in this photo?

Can you identify the Code violation(s) in this photo?

Hint:Wrong end up = dangerous ashtray.

Find the Answer

How well do you know the Code? Think you can spot violations the original installer either ignored or couldn’t identify? Here’s your chance to moonlight as an electrical inspector and second-guess someone else’s work from the safety of your living room or office. Can you identify the Code violation(s) in this photo?

‘Tell Them What They’ve Won...’

Using the 2008 NEC, correctly identify the Code violation(s) in this month’s photo — in 200 words or less — and you could win something to put in your tool­box. E-mail your response to [email protected], and we’ll select three winners (excluding manufacturers and prior winners) at random from the correct submissions. Winners will receive a set of insulated hand tools from Ideal Industries, Inc., valued at more than $125.* The set includes 9.25-in. insulated side-cutting pliers, 10-in. insulated tongue-and-groove pliers, and a 0.25-in. 3 6-in. insulated screwdriver. (* Please allow six to eight weeks for delivery of tools.)

DECEMBER WINNERS

Our three winners this month include: Mike Good, a senior project manager with Stanley Consultants in Centennial, Colo.; Massimo Lemma, an electrical inspector with Middle Department Inspection Agency in Clayton, Del.; and Phoenix Pham, P.E., an electrical engineer with Sanitation Districts of Los Angeles County in Whittier, Calif. These guys all pointed out numerous violations with this so-called weather head installation.

The most obvious problem with this service drop installation is the missing service head on the service mast. This is a clear violation of 230.54(A). The missing service head allows water to enter the raceway, which also creates a violation of 230.54(G). One can also assume that, because the service drop conductors continue up the wall above this point, there’s a good chance the overhead service attachment point isn’t positioned within 2 ft of the missing service head, as noted in the Exception of 230.54(C).

In addition, it appears the conductors mounted on the wall are individual insulated service drop conductors. These are not approved for mounting in direct contact with a building wall. They must be mounted on insulating supports that provide a clearance of at least 2 in. from the wall surface [230.51(B)]. A metal conduit strap clearly does not meet these requirements.

One other item to note is the improper phase identification marking on the conductors. It appears that two of the three cables have white tape wrapping on them. The rules for marking grounded conductors can be found in 200.7.

About the Author

Joe Tedesco

Tedesco served the industry in many roles during his career. He was a director, senior electrical code instructor for National Technology Transfer, Inc. and American Trainco, Inc.. He was also a codes, standards and seminar specialist for the International Association of Electrical Inspectors and an electrical field service specialist for the National Fire Protection Association in Quincy, Mass. He ran his own business as an NEC consultant and is a Massachusetts licensed master electrician and journeyman electrician and certified electrical inspector (one and two family 2A; General 2B, and Plan Review, 2C). Tedesco also wrote articles for CEE News and EC&M (Code Violations Illustrated and What's Wrong Here?) for more than 15 years and helped launched the Moving Violations video series.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Don't Let Burn-Through Threaten Another Data Center or Utility Project

Get the No Burn-Through Elbow eGuide to learn many reasons why Champion Fiberglass elbows will enhance your data center and utility projects today.

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.