Moving Violations Video No. 74, by Russ LeBlanc, NEC Consultant: Insufficient Receptacle Protection

Discuss this Video 3

on Jun 26, 2014

From the looks of the rust on the lock nut, this installation has been there for some time. Is it possible that when this receptacle was installed, it met current codes? You seem to imply that everything you find must meet the latest Code requirements.

on Jun 26, 2014

Keep in mind that this may not be a violation if it was installed prior to the Code having these requirements. The Code is not retroactive.

on Jul 1, 2014

I see two others have the same thought I did. As the installation appears to be existing, it may have been compliant at the time.

On the flip side, I found the requirement for the outlet cover being weatherproof whether a cap is plugged-in or not to be in each Edition going back to the 2002 NEC (oldest version I have at hand.)

Besides, appearing to be a ball park with young children present wouldn't it be a good idea to at least replace the cover so it is compliant?

Please or Register to post comments.

Electrical Testing Feed

EC&M Webinars
Jul 26, 2016
Sponsored

Data-Driven Decisions Through Smart Building Technology – How IoT Impacts Facility Professionals

The Internet is this generation’s industrial revolution. It continuously creates new opportunities and impacts our facilities across every industry. One important example is how IoT has impacted facility operations through integration and accessibility of many of the building systems. Much like the convergence of IT and Telecom into VoIP, the internet has the capability to align facilities and IT to create a Smart Facility....More
Jul 28, 2016
Sponsored

Next Generation Lighting- The Emergence of POE for Lighting

Historically, lighting controls have always had a singular responsibility: Manage the light. Until now....More
EC&M Learning Center

Connect With Us

Sponsored Introduction Continue on to (or wait seconds) ×