Moving Violations Video No. 43, by Russ LeBlanc, NEC Consultant: Fusible Switch

Discuss this Video 2

Paul Dunphy (not verified)
on Mar 7, 2013

Hello Russ,
Check 70E requirements for LO/TO and PPE before exposing yourself to shock and arc flash.
Also see NEC 110.16.
You may want to think about a re-do of the video.
Be safe,
Paul

Russ LeBlanc (not verified)
on Mar 7, 2013

Paul, thanks for reminding us about shock and arc-flash hazards.

I made sure to de-energize the power feeding this disconnect and verify absence of voltage on the feeder before I opened it.
That is standard procedure for any of my videos or photos where I have to have a panel open or when I'm near other exposed energized parts.

Russ

.

Post new comment
Sign In or register to use your Electrical Construction & Maintenance (EC&M) Magazine ID
(optional)

White Papers
EC&M Learning Center
Webinars
EC&M TV
Apr. 15, 2013
video

The Westex Difference

Learn what sets Westex apart from other flame resistant fabric manufacturers....More

Newsletter Signup

Connect With Us