Moving Violations Video No. 35, by Russ LeBlanc, NEC Consultant: Non-Sunlight Resistant PVC Clips & Fittings

Discuss this Video 2

John Saporito (not verified)
on Nov 1, 2012

The electrical inspector must had taken a bribe.

anonymous (not verified)
on Nov 24, 2012

Bad enough that #12's are spliced to old cloth covered #10's. However, rather than cover the T-11 replace it with a 4x11/16 box & blank cover, remove the 30a CB or replace the conductors as needed. This video is indicative of the workmanship all too common today.

Please or Register to post comments.

Electrical Testing Feed
Join the Discussion on EC&M Talk

EC&M Webinars
Nov 9, 2016
Webinar

Technology Enabled Data Center Life Cycle Services

This webinar will discuss the benefits of cloud connected data center monitoring, different levels of monitoring and the potential effects on availability and efficiency....More
Nov 2, 2016
Webinar

There is More to a Data Center than White Space; A Holistic Approach to Facility Monitoring and Control

This webinar will discuss the benefits of cloud connected data center monitoring, different levels of monitoring and the potential effects on availability and efficiency....More
EC&M Learning Center

Connect With Us

Sponsored Introduction Continue on to (or wait seconds) ×