Moving Violations Video No. 32, by Russ LeBlanc, NEC Consultant: Corrosion Protection Requirements

Discuss this Video 1

Mike Lamond (not verified)
on Sep 27, 2012

I once had a project at a refrigeration plant which used ammonia as the circulating fluid to the cooling load. After more than 20 years of exposure to ammonia fumes and water, all of the rigid conduits that came out of the concrete floor ended 8-10 inches above the floor. The exposed conductors simply continued through the gap, possibly by force of habit.

Please or Register to post comments.

Electrical Testing Feed
Join the Discussion on EC&M Talk

EC&M Webinars
Nov 9, 2016
Webinar

Technology Enabled Data Center Life Cycle Services

This webinar will discuss the benefits of cloud connected data center monitoring, different levels of monitoring and the potential effects on availability and efficiency....More
Nov 2, 2016
Webinar

There is More to a Data Center than White Space; A Holistic Approach to Facility Monitoring and Control

This webinar will discuss the benefits of cloud connected data center monitoring, different levels of monitoring and the potential effects on availability and efficiency....More
EC&M Learning Center

Connect With Us

Sponsored Introduction Continue on to (or wait seconds) ×