Code Quiz

June 2, 2011
When installing the required branch circuit for an electric sign or outline lighting in a commercial building — including each occupancy, which has access to pedestrians — at least one outlet shall be supplied by a branch circuit that has a minimum rating of _______.

Fill in the blanks with the correct answers.

When installing the required branch circuit for an electric sign or outline lighting in a commercial building — including each occupancy, which has access to pedestrians — at least one outlet shall be supplied by a branch circuit that has a minimum rating of _______. The branch circuit shall also be considered to be a ___________.

  1. 20A; continuous load.
  2. 30A; non-continuous load.
  3. 15A; non-essential load.
  4. There is no specific requirement for a commercial building or occupancy.

Answer: A

As per 600.5, when installing the required branch circuit for an electric sign or outline lighting in a commercial building — including each occupancy space that has access to pedestrians — at least one outlet shall be supplied by a branch circuit that has a minimum rating of 20A. The branch circuit shall supply no other loads and shall also be considered to be a continuous load.

Owen is the owner and president of National Code Seminars and the holder of master electrician certifications in 46 states. He can be reached at [email protected].

About the Author

Steven Owen

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Fiberglass Electrical Conduit Chemical Resistance Chart

This information is provided solely as a guide since it is impossible to anticipate all individual site conditions. For specific applications which are not covered in this guide...

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.