Corrections

March 1, 2001
Corrections

The editors of Power Quality Assurance Magazine were alerted to the following errors:

The December 2000 article, “Power Quality Monitoring for High Reliability Systems,” contained two swapped figures. As a result, the captions did not correlate with the pictures, making it difficult for readers to understand the information. Shown at right are the correct figures and captions for Figs. 2 and 3, which appeared on page 35.

The cover story in the January 2001 issue, “Is Your Lightning Protection System What It Should Be?” also contained several errors.

  • The source for reference number 7 was not included. It is R. Golde, “Physics of Lightning,” 1977.

  • Lightning type (c), shown in the photo on page 10, should read “intracloud,” not “intrecloud.”

  • At the end of the first paragraph on page 12, the text in parentheses should read “25 ohms per NEC,” not “25W.”

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Don't Let Burn-Through Threaten Another Data Center or Utility Project

Get the No Burn-Through Elbow eGuide to learn many reasons why Champion Fiberglass elbows will enhance your data center and utility projects today.

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.