ECM Buyers' Guide

electrical operations & maintenance


Metals and Minerals Industry on the Rise in 2009 

Aug 1, 2009, 

A total of 593 projects, totaling more than $42 billion in active metals and minerals projects, are on track this year, 180 of which are located in the Great Lakes region...

License for Renewable Energy Installation 

Aug 1, 2009, 

Licensing and certification information for electrical contractors looking into renewable energy projects...

Automating Your Business Processes for Success 

Aug 1, 2009, By Marty Hilsenteger, Singletouch

Enterprise-level workflow and data-collection software solutions help electrical contractors deliver the kind of accuracy and accountability project owners have come to demand...

Evaluating Electric Snowmelt Systems 

Aug 1, 2009, By Paul Christoferson, Madsen, Kneppers & Associates, Inc.

IR cameras and thermographic analysis can save time and money in maintenance and troubleshooting of many electrical circuits, particularly snowmelt systems...

Survival of the Fittest 

Aug 1, 2009, By Beck Ireland, Staff Writer

With depleted backlogs and fewer projects on the horizon, the firms on EC&M's 2009 Top 50 electrical contractors list restructured in 2008 to face the challenges this year and beyond....

The Case of the A/C Installation Gone Wrong 

Aug 1, 2009, By Eric David, Liaicon

Air-conditioning (AC) tech is electrocuted on roof of strip mall, after coming in contact with an energized sign that later proved to have no solid ground path...

After Shock 

Jun 1, 2009, By Beck Ireland, Staff Writer

Symptoms and treatment in the aftermath of electrical injury...

The Basics of Electrical Overheating 

Jun 1, 2009, By Chris Korinek, P.E., Synergy Technologies LLC

Practical tips for identifying and reducing the most common causes of electrical fires...

Essential Tests for Structured Cable 

Jun 1, 2009, By Subrata Mukherjee, Fluke Networks

Exploring the business opportunities that exist for electrical contractors/electricians through properly installed and tested cable...

A Fine Line 

Jun 1, 2009, By Michael Eby, Editor-in-Chief

Making sure your safety program has a near-miss process goes a long way toward reaching the goal of a zero-injury workplace...

From the Forensic Files of NIOSH 

May 15, 2009, 

Disregard for established lockout/tagout procedures is not only risky, but it can also be fatal, as was evidenced by the death of an electrician at a California newspaper recycling factory....

Building a Successful Customer Management Program 

May 1, 2009, By Brad Dawson, LTV Dynamics

Electrical contractors must establish a proactive customer management program to help them identify and secure untapped profit potential...

Multitaskers 

May 1, 2009, By Beck Ireland, Staff Writer

How electrical contractors can increase profits by pulling double duty with structured cabling services divisions...

A Lesson in SBA Loans 

May 1, 2009, By Mark E. Battersby, Freelance Writer

Newly expanded Small Business Administration (SBA) programs may be new quick fix for smaller electrical contractors...

Putting PPE Performance to the Test 

May 1, 2009, By Dan Doan, DuPont, and Tom Neal, Neal Associates

At the 2009 IEEE Electrical Safety Workshop held in St. Louis in February, we presented the results from our new study, Field Analysis of Arc Flash Incidents...

The Case of the Imperfect Bird on a Wire 

Apr 1, 2009, By Michael S. Morse, Ph.D., University of San Diego

After a general laborer escapes serious injury following contact with electrical current, forensic investigators liken his experience to a bird on a wire scenario...

Maximizing VFD and UPS Performance 

Apr 1, 2009, By Randy Barnett, American Trainco, Inc.

If you're installing a variable-frequency drive (VFD) or uninterruptible power supply (UPS) or if you already have this equipment in place you should...

Installing and Troubleshooting Arc Discharge Lamps 

Apr 1, 2009, By Joe Knisley, Senior Editorial Consultant

Understanding how fluorescent and high-intensity discharge (HID) lamps work makes problem solving and corrective maintenance easier...

Module Behavior 

Apr 1, 2009, By Beck Ireland, Staff Writer

Prolonging PV module life by improving inverter maintenance and manufacturing...

Managing Schedule Acceleration More Effectively 

Apr 1, 2009, By Bob Mitchell, Integrated Management Group

A pre-bid risk assessment guide for electrical contractors working on fast-track projects ...

Previous | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 | 32 | Next

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

Area Takeoff Tools

March 22, 2010

Area takeoff tools

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook



Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues