ECM Buyers' Guide
  

When Power Fails

The owners of a 33-story office building at 75 Broad St. (which is a few blocks east of the WTC and close to the NY Stock Exchange) invested $30 million to create a technology center suitable for Wall Street-type tenants. This foresight paid off after the attack. At about 7 p.m. on September 12, Con Ed disconnected the building from the power distribution grid in order to route sufficient power to other downtown buildings.

The utility was able to make this request because the building has 25 diesel engine generators for standby use, enabling the tower to remain operational when basic services fail. Occupying the 17th and 18th floors of the tower, these 800kW units are served by an 18-in diameter pipe that runs around the perimeter of one floor for fuel delivery to the engines. The pipe holds 8,000 gal of fuel, while 32,000 additional gal of fuel are stored in the subbasement.

The massive business disruptions caused by the WTC attack have brought renewed interest in standby power systems and redundant data centers in the New York metro area and elsewhere. At the same time, buildings equipped for “telco hotels” or “hubs” are getting attention. Businesses that use paper records extensively may rethink their storage methods, says Snezana Anderson, a management director of Insigna/ESG, a brokerage services company.


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 2, 2012 7:54 PM

What's Wrong Here?

Jan 19, 2012 4:06 PM

What's Wrong Here?

Jan 5, 2012 11:53 AM

View all What's Wrong Here?

product spotlight

Labeling tool

Feb 10, 2012 7:58 AM

Labeling tool

The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M TV

Arlington CP9000

Arlington's new 9" diameter ceiling cover plate is the neatest way to cover unused "high hat" cans. With no tools needed, installation couldn't be faster!...

Arlington Gangable Boxes

Designed for new or retrofit applications, these snap-together gangable plastic boxes eliminate the need to construct a multiple-gang steel box out of several individual ones...

Understanding NEC Requirements for Solar Photovoltaic Systems
During this session, Mike Holt will address possible conflicts or confusing NEC requirements, provide tips on proper electrical installation techniques, and discuss the dangers related to improper installations. View this On Demand Webinar!



resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues