Inspector's Tips

Oct 1, 2005 12:00 PM, By Tom Garvey, electrical inspector for the state of Wisconsin


         Subscribe in NewsGator Online   Subscribe in Bloglines   

Follow these tips so your wirewayless wiring installation passes inspection.

  1. Following the NEC guidelines, install electrical wiring and equipment in a neat and workmanship-like manner.

  2. Use control gear listed to UL 508, as they meet the regulations spelled out in NFPA 70 and NFPA 79, respectively.

  3. Have documentation to show your machine was built and tested for its particular environment.

  4. Ensure the conductors and cords are electrically protected within their limitations, voltage, and currents.

  5. If using transient voltage surge suppressors, install them downstream from the circuit breakers or fuses so they don't become a fire hazard.

  6. Do not use supplemental protectors as a substitute for a branch-circuit-rated overcurrent protective device.

Want to use this article? Click here for options!

product of the week

Evaluation Software

December 1, 2008 9:59 AM

Honeywell Power Evaluation Software

View all 2008 Products of the Week

Recent Comments

Follow comments on ecmweb.com




Arc Flash Conferences   Code Change Conferences

Professionals provide answers to your questions.



Do you have any technical paper explaining IBC?

iGard Resistance Grounding Q&A BookletDownload the Resistance Grounding Q&A Booklet
I-Gard
EC&M TV

Retrofit 2-Gang TV Box(TM)

Arlington’s recessed two-gang TV BOX™ for old work allows you to mount LCD and plasma TVs, and other system components flush against the wall.

Listen
"Sizing Gen-Sets: Facts, Hints, and Good Judgment"
Listen
Sponsored By:

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Back to Top

Browse Back Issues

Browse Back Issues