Riding the Light Wave

As our company began work one night on installing a new fire alarm system in the office area of a manufacturing facility, I stepped from a six-foot step ladder onto the top of an eight-foot cubicle partition. To steady myself, I put my hand on one of the two-lamp fluorescent fixtures that was hanging above the office area on chains. The chains must not have been anchored into the ceiling very well because the one I was holding broke free under my weight…and so did every other one in the 100-foot line of lights, one after the other. From my angle it looked like a wave of fixtures laying down gently and in a straight line on the floor. Luckily for me, it so happened this particular line didn't cross any partitions, and the fixtures were only slightly damaged as they fell. After waking up someone from the local electric supply warehouse at 2 a.m. for lamps, we brought in a batch of rolling scaffolds and were able to make things right before the first shift arrived at 7 a.m.
Herman Bolton
Asheboro, N.C.







Wire Wound Up

One of the first large jobs I got to run involved pulling four 500 MCM cables and a 1/0 AWG ground into four-inch rigid steel conduit that we'd installed over the course of a three-week job. We used the entire morning to lay out the cable in a zigzag pattern, set up the puller, and plan who would be where during the pull. I even took a little time to school the apprentices on proper make up and how to stagger the cables as they went into the sock. By early afternoon we had about one-third of the cable in the pipe and all was going well when I walked to the feed side of the pull and noticed one of the cables wasn't being used up like the other three. I immediately stopped the pull. It turned out someone had mislabeled one of the other cables and fed both ends into two different conduit openings. Suffice it to say, 500 MCM comes out of four-inch conduit a lot tougher than it goes in.
Darryl Cotton
San Diego

Got a story about a jobsite blunder? Send it to electrical_group@primediabusiness.com. If we publish it, we'll send you a check for $25.


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 2, 2012 7:54 PM

What's Wrong Here?

Jan 19, 2012 4:06 PM

What's Wrong Here?

Jan 5, 2012 11:53 AM

View all What's Wrong Here?

product spotlight

Labeling tool

Feb 10, 2012 7:58 AM

Labeling tool

The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M TV

Arlington CP9000

Arlington's new 9" diameter ceiling cover plate is the neatest way to cover unused "high hat" cans. With no tools needed, installation couldn't be faster!...

Arlington Gangable Boxes

Designed for new or retrofit applications, these snap-together gangable plastic boxes eliminate the need to construct a multiple-gang steel box out of several individual ones...

Understanding NEC Requirements for Solar Photovoltaic Systems
During this session, Mike Holt will address possible conflicts or confusing NEC requirements, provide tips on proper electrical installation techniques, and discuss the dangers related to improper installations. View this On Demand Webinar!



resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues