If a construction worker is shocked or electrocuted during a project that requires heavy digging, it's usually the result of hitting a buried line. However, in the case of a contract worker who was shocked while helping to lay a sewer line along a paved road in a suburban area, the accident involved an overhead line. The project required the worker in question and the rest of his crew to use a trenching machine and a front-end loader to transport crushed stone to place under the sewer pipe and refill the trench. Things were going fine until low-hanging telephone and TV cables running parallel to the road became snagged on the side mirror of the front-end loader.

At first, the problem seemed easy to fix. The worker was instructed to raise the telephone and TV cables so that the project could proceed. The plan called for him to temporarily pull down the electric utility neutral conductor and tie it together with the telephone and TV cables using a rope, similar to a previously made tie as shown in the Photo at right. The crew agreed that the quickest way to reach the cables and perform this task was to use the front-end loader as an elevator and lift the worker off the ground and up to the cables and conductor.

Because TV and telephone cables were hanging too low, the crew had to tie them to the neutral conductor, setting the stage for the accident.

However, before the worker completed tying a knot in the rope he received an electric shock from the neutral conductor. The shock first burned him and then threw him to the ground. His injuries included severe burns to his neck, leg, and arm. His hand and lower part of his arm had to be amputated.

The worker filed suit against the electric utility, the cable TV company, and the telephone company, and I was called in to serve as an expert witness on behalf of the injured worker.

Assessing the scene. A review of the scene revealed that a single, bare-stranded 7.96kV primary conductor was located at the top of the utility poles in the span in question. Below this single-phase conductor was a single, bare-wire neutral conductor. The neutral conductor was connected to grounding wires only at the utility poles that were equipped with overhead distribution transformers. The poles with transformers were typically spaced at a three-pole interval. This is a standard design configuration for most electric utility distribution lines. It was also noted that the telephone company owned the utility poles.

A post-accident inspection by OSHA personnel confirmed that the TV and telephone cables didn't meet the vertical clearance requirements stipulated in Table 232-1 of the National Electrical Safety Code (NESC). A mid-span vertical clearance measurement at the site of the accident was found to be approximately 11 feet. The clearance requirement as outlined in Table 232-1 of the NESC is 16 feet.

A review of safety procedures. Although these low-hanging cables created the conditions for the accident, they weren't the cause of the electric shock. It was first thought that the worker in the bucket of the front-end loader reached up and contacted the primary conductor with his hand. The typical OSHA rule on working clearances is that a worker must maintain a 10-foot clearance from energized conductors. Per OSHA 1926.403(j)(3)(iii), unguarded live parts above a working space shall be maintained at elevations not less than specified in Table K-3 (Table).

The conductors were hanging much lower than what Table K-3 of OSHA 1926.403(j)(3)(iii) allows.

However, reports from witnesses and the worker himself revealed that the neutral conductor, telephone, and TV cables were level with his chest at the time of the accident. Therefore, I concluded that he received the shock from his contact with the bare neutral conductor.

But how could that have happened? The neutral conductor can become energized under several conditions. For example, if the neutral is broken or disconnected before it reaches the utility substation, the remaining portion of the neutral becomes energized by the connections of the primary windings of the distribution transformers between the primary conductor and the neutral.

In this case, analysis of the grounding system for the 13.8kV single-phase radial power line showed that several hundred volts could exist between the neutral and ground at several places along its length. To my knowledge, the electric utility didn't test the neutral or the grounds at the poles near the accident site.

This case was settled before it went to trial. The injured worker accepted an award of several million dollars in lieu of a lengthy court case. If it had gone to court, all of the defendants would most likely have been found liable for not maintaining their overhead cables at the required heights.

Kusko is vice president of Exponent Failure Analysis Associates in Natick, Mass.


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 2, 2012 7:54 PM

What's Wrong Here?

Jan 19, 2012 4:06 PM

What's Wrong Here?

Jan 5, 2012 11:53 AM

View all What's Wrong Here?

product spotlight

Labeling tool

Feb 10, 2012 7:58 AM

Labeling tool

The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M TV

Arlington CP9000

Arlington's new 9" diameter ceiling cover plate is the neatest way to cover unused "high hat" cans. With no tools needed, installation couldn't be faster!...

Arlington Gangable Boxes

Designed for new or retrofit applications, these snap-together gangable plastic boxes eliminate the need to construct a multiple-gang steel box out of several individual ones...

Understanding NEC Requirements for Solar Photovoltaic Systems
During this session, Mike Holt will address possible conflicts or confusing NEC requirements, provide tips on proper electrical installation techniques, and discuss the dangers related to improper installations. View this On Demand Webinar!



resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues