In-house maintenance staff can typically handle the two periodic tests needed for dry-type transformers: 1) insulation resistance testing, and 2) core ground (if applicable). One advantage of oil-filled transformers over dry type is you can tell a whole lot more about their condition. However, the tests you must perform to get this information are typically beyond the capabilities of in-house maintenance staff.

Use a qualified testing firm to conduct a full program that includes the dry-type tests plus:

  • Insulation PF testing
  • Oil samples (sent out for analysis)
  • Oil gas analysis
  • Detailed internal inspection and connection testing
  • Other tests as warranted (e.g., impedance, excitation current)

Required frequency ranges from three months to five years, depending upon transformer condition and criticality. When scheduling the shutdown, allow for contingencies.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Fiberglass Electrical Conduit Chemical Resistance Chart

This information is provided solely as a guide since it is impossible to anticipate all individual site conditions. For specific applications which are not covered in this guide...

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.