Optional Feeder and Service Calculations, Part 2

April 8, 2013
Previously, we said you can use the time-saving optional method if you have certain information.

Previously, we said you can use the time-saving optional method if you have certain information. You could even put together a project review checklist to allow you to quickly assess whether you must use the standard method instead. However you lay out your checklist, it needs to show these requirements for using the optional method for these applications:

  • School [220.86]: It's equipped with AC and/or electric space heating.
  • Existing loads [220.87]: You have the maximum demand data for the past year, the maximum demand at 125% plus the new load won't exceed the service or feeder ampacity, and you protect the feeder per 240.4 or service per 230.90.
  • Restaurant [220.88]: The feeder serves the total load.
  • Dwelling unit [220.82]: Regardless of the type of dwelling unit, to qualify for the optional method it must have a total connected load served by single 120/240V or 208Y/120V 3-wire service or feeder with at least 100A ampacity.

If the dwelling unit qualifies, then assess whether it is:

  • Existing dwelling unit [220.83]: Use the optional method only if the feeder or service can carry additional loads.
  • Multi-family dwelling unit [220.84]: Use the optional method only if each unit has electric cooking equipment and heat or AC, plus no more than one feeder.

Voice your opinion!

To join the conversation, and become an exclusive member of EC&M, create an account today!

Sponsored Recommendations

Electrical Conduit Comparison Chart

CHAMPION FIBERGLASS electrical conduit is a lightweight, durable option that provides lasting savings when compared to other materials. Compare electrical conduit types including...

Don't Let Burn-Through Threaten Another Data Center or Utility Project

Get the No Burn-Through Elbow eGuide to learn many reasons why Champion Fiberglass elbows will enhance your data center and utility projects today.

Considerations for Direct Burial Conduit

Installation type plays a key role in the type of conduit selected for electrical systems in industrial construction projects. Above ground, below ground, direct buried, encased...

How to Calculate Labor Costs

Most important to accurately estimating labor costs is knowing the approximate hours required for project completion. Learn how to calculate electrical labor cost.