ECM Buyers' Guide
Email   Facebook   Digg   Twitter   More     (0)   

What's Wrong Here?

Nov 1, 2009 12:00 PM, By Brian McPartland, NEC Consultant

Here’s your chance to moonlight as an electrical inspector and second-guess someone else’s work from the safety of your living room or office. Can you identify the Code violation(s) in this photo?

How well do you know the Code? Think you can spot violations the original installer either ignored or couldn't identify? Here's your chance to moonlight as an electrical inspector and second-guess someone else's work from the safety of your living room or office. Can you identify the Code violation(s) in this photo?

Hint: Recognized means of support






September Winners

Our three winners this month were: Michael McCarty, owner, Glow-Brite Electric Co., Dacula, Ga.; Rick Williams, president, Williams Electrical Service, Inc., Pasadena, Md.; and Ron Patterson, owner, Patterson Electric Co., Dillon, Colo. Here's a list of the most noticeable Code violations these three associated with this octopus-like handy box arrangement.

Of the many violations identified by readers, 110.12 “Mechanical Execution of Work” was on virtually everyone's list. The first sentence of this section requires electrical work to be performed in “a neat and workman-like manner.” Although that wording is somewhat subjective in terms of actual enforcement, this installation clearly fails to meet that criterion.

Section 200.7 was another popular pick. This rule essentially reserves the use of white, gray, and white stripes on any color insulation other than green for the “grounded conductor.” Remember, although the “grounded conductor” is generally a neutral conductor, such as in typical 208Y/120V and 480Y/277V grounded systems, it could also be a phase conductor, such as in the “corner-grounded” 480V or 240V delta systems.

The rules for box fill, given in 314.16, were also nearly universally referenced. It seems very clear that this outlet box is in violation of these requirements. By limiting the number of current-carrying conductors within a box, the heat generated will be allowed to dissipate before reaching a temperature that will cause the conductors' insulation to start breaking down.

One of the other commonly cited Code violations related to 400.7, which covers “Uses Permitted” for flexible cords. This application is not among the many specific uses identified by this rule. Part (B) to 400.7 only recognizes the supply of flexible cords from a receptacle, not to a receptacle. Additionally, 400.8 can be referenced because subpart (1) to that rule prohibits flexible cord from being used “as a substitute for fixed wiring of a structure.”



‘TELL THEM WHAT THEY'VE WON…’

Using the 2008 NEC, correctly identify the Code violation(s) in this month's photo — in 200 words or less — and you could win something to put in your tool-box. E-mail your response to brianjbmcpar@aol.com, and he'll select three winners (excluding manufacturers and prior winners) at random from the correct submissions. Winners will receive a set of insulated hand tools from Ideal Industries, Inc., valued at more than $125.* The set includes 9.25-in. insulated side-cutting pliers, 10-in. insulated tongue-and-groove pliers, and a 0.25-in. ÷ 6-in. insulated screwdriver. (* Please allow six to eight weeks for delivery of tools.)

Want to use this article? Click here for options!

Code Challenge

Code Quiz

Mar 11, 2010 12:45 PM, By Steven Owen

When installing outlet boxes for wall-mounted luminaires, when can you use No. 6 screws to secure the luminaire yoke to a plaster ring?...


More Code Quizzes

Code Q&A

Mar 11, 2010 12:48 PM, By Mike Holt

Q. Can a receptacle be used as a splicing device?...


More Code Q&As
 



Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues