ECM Buyers' Guide
    (0)    Follow WWH?

What's Wrong Here?

Dec 1, 2008 12:00 PM, By Joe Tedesco, NEC Columnist

How well do you know the Code? Think you can spot violations the original installer either ignored or couldn't identify? Here's your chance to moonlight as an electrical inspector and second-guess someone else's work from the safety of your living room or office. Can you identify the Code violation(s) in this photo?

Hint: Now you see it — now you don't.


October Winners

Our three winners this month were: Khondker Ahmed, electrical engineer III, New York City Transit, Broadway, N.Y.; Aaron Beatty, electrical engineer/project manager, Professional Consultants, Inc., Evansville, Ind.; and James E. Young, P.E., project manager, Washington Group International, Inc., Denver.

Here's a list of some of the Code sections they felt were in violation.

As per 590.4(F), “All lamps for general illumination shall be protected from accidental contact or breakage by a suitable luminaire or lampholder with a guard.”

Two references can also be made on the damp or wet location front. As per 410.10(A), “Luminaires installed in wet or damp locations shall be installed such that water cannot enter or accumulate in wiring compartments, lampholders, or other electrical parts.” As per 410.96, “Lampholders installed in wet or damp locations shall be of the weatherproof type.”

If this installation was made for temporary reasons or done so in conjunction with a decorative lighting display then the time constraint requirements of 590.3 would also come into play.

‘TELL THEM WHAT THEY'VE WON…’

Using the 2008 NEC, correctly identify the Code violation(s) in this month's photo — in 200 words or less — and you could win something to put in your toolbox. E-mail your response to electrical.group@penton.com, and we'll select three winners (excluding manufacturers and prior winners) at random from the correct submissions. Winners will receive a set of insulated hand tools from Ideal Industries, Inc. valued at more than $125.* The set includes 9.25-inch insulated side-cutting pliers, 10-inch insulated tongue-and-groove pliers, and a 0.25-inch × 6-inch insulated screwdriver.

* Please allow six to eight weeks for delivery of tools.

Want to use this article? Click here for options!

Code Challenge

Code Quiz

Nov 5, 2009 5:24 PM, By Steven Owen

What are the minimum and maximum lengths permitted for the grounding conductor on network-powered broadband communications systems network interface units that contain protectors?...


More Code Quizzes

Code Q&A

Nov 5, 2009 5:30 PM, By Mike Holt

When are tamper-resistant receptacles required?...


More Code Q&As
 


Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Nov 5, 2009 11:50 AM

What's Wrong Here?

Oct 22, 2009 11:16 PM

What's Wrong Here?

Oct 8, 2009 3:32 PM

View all What's Wrong Here?

product of the week

Video camera scopes

November 16, 2009

Video camera scopes

View all 2009 Products of the Week

Recent Comments

More...


EC&M TV

Exterior Fixture Box for Brick or Stone

Installing a fixture box in a brick or stone wall just got easier with Arlington’s new adjustable depth box!

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight in only 2-1/2 hours with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar. The agenda is packed with valuable information that focuses on installation tips!

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues