Nov 19, 2009 5:41 PM, By Brian J. McPartland, NEC Consultant

Hint: Physical protection

In 334.15(B), which covers Type NM cable, the NEC states, "Cable shall be protected from physical damage where necessary by rigid metal conduit, intermediate conduit, electrical metallic tubing, Schedule 80 PVC conduit, or other approved means." Clearly, the NM cable shown here is in need of physical protection.

Another concern with this installation relates to the basic rule in the first sentence of 314.17, which says, "Conductors entering boxes, conduit bodies, or fittings shall be protected from abrasion and shall comply with 314.17(A) through (D)." Again, this installation fails to meet this requirement.

Additionally, this setup doesn't satisfy the rule put forward in the last two sentences in 314.17(B), which states, "Except as provided in 300.15(C), the wiring shall be firmly secured to the box or conduit body. Where raceway or cable is installed with metal boxes or conduit bodies, the raceway or cable shall be secured to such boxes and conduit bodies."

Last but not least, although it's somewhat hard to see, it appears as if the grounding conductor is spliced to a pigtail without a wire connector. Section 250.8(A) identifies the acceptable methods for connecting grounding and bonding conductors. This rule reads as follows: "Grounding conductors and bonding jumpers shall be connected by one the following means: (1) listed pressure connectors; (2) terminal bars; (3) pressure connectors listed as grounding and bonding equipment; (4) exothermic welding process; (5) machine screw-type fasteners that engage not less than two threads or are secured with a nut; (6) thread-forming machine screws that engage not less than two threads in the enclosure; (7) connections that are part of a listed assembly; and (8) other listed means." Simply wrapping one ground wire around another is not acceptable, because under fault conditions this type of connection is likely to come undone, which will "open" the fault-return path.

> Try Another Quiz

Want to use this article? Click here for options!

Code Challenge

Code Quiz

Aug 26, 2010 12:07 PM, By Steven Owen

With respect to interconnected electric power production sources (Art. 705), is it required to automatically disconnect a 3-phase primary power source from all ungrounded conductors when one of the phases opens to create a loss of power on one or more phases? ...


More Code Quizzes

Code Q&A

Aug 26, 2010 12:02 PM, By Mike Holt

Q. Is the electrical wiring system used to feed ceiling fixtures allowed to be supported by the ceiling support wires?...


More Code Q&As
 



Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Aug 26, 2010 11:52 AM

What's Wrong Here?

Aug 12, 2010 12:02 PM

What's Wrong Here?

Aug 1, 2010 12:00 PM

View all What's Wrong Here?

product of the week

Gangable Boxes

September 7, 2010

Gangable boxes

View all 2010 Products of the Week

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook



Professionals provide answers to your questions. Become an expert!

T4 Emissions Regulations
Aniruddha Natekar

Q. We have had emission regulation changes in the decade. Why is Tier 4 gathering so much attention? Read the answer.

Ask a Question


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Arlington MC Cable Connectors

One size fits several cable sizes when you use Arlington’s low cost, zinc diecast MC Cable Fittings...

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Making Dollars and Sense of Power Quality
Power quality issues cost you valuable time and money. In this webinar we will explore how power quality impacts your facility and bottom line. Understanding what it is, where to look and what you can do about it. View this On Demand Webinar!

Electric Vehicles are Coming
Automakers have started to launch new electric vehicles (EVs), or plug-in hybrid electric vehicles (PHEVs), in to the U.S. marketplace. EVs have the potential to revolutionize personal roadway transportation, and the "fuel" for this new breed of vehicles is electricity. View this On Demand Webinar!

Learn about the changes in this new code cycle by attending the premier source of NEC information and training: EC&M University's 2011 NEC Code Change Conferences. In two informative and interest-filled days, you’ll learn about major NEC changes that will impact your work, whether you’re an electrician, contractor, engineer, designer, or plant/facility maintenance professional.

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues