”This 240V, 3-phase, 3-wire panelboard features 2- and 3-pole breakers,” says Ray Larsen, a professional engineer with PacifiCurrent Electrical Engineering in La Crescenta, Calif. “Since the breakers are not used as switches, is this a legal installation (besides having a missing cover)? The remaining breakers in use serve the building's HVAC units. The other enclosure to the right is also a 240V, 3-phase, 3-wire panel. One breaker feeds a 240V receptacle.”

This installation violates several NEC rules.

As per 240.24(A), “Overcurrent devices shall be readily accessible and shall be installed so that the center of the grip of the operating handle of the switch or circuit breaker, when in its highest position, is not more than 2.0 m (6 ft 7 in.) above the floor or working platform unless one of the following applies:
“(1) For busways, as provided in 368.12.
“(2) For supplementary overcurrent protection, as described in 240.10.
“(3) For overcurrent devices, as described in 225.40 and 230.92.
“(4) For overcurrent devices adjacent to utilization equipment that they supply, access shall be permitted to be by portable means.”

In addition, 404.8 states, “All switches and circuit breakers used as switches shall be located so that they may be operated from a readily accessible place. They shall be installed such that the center of the grip of the operating handle of the switch or circuit breaker, when in its highest position, is not more than 2.0 m (6 ft 7 in.) above the floor or working platform.” There are three exceptions to this rule, but none apply in this particular installation.

> Try Another Quiz

Want to use this article? Click here for options!

Code Challenge

Code Quiz

Feb 2, 2012 9:02 PM, By Steven Owen

When installing audio distribution cables exposed on the surface of ceilings and sidewalls, the cables shall be supported by which of the following products?

    ...


More Code Quizzes

Code Q&A

Feb 2, 2012 8:58 PM, By Mike Holt

Q. Is it acceptable to use a 14 AWG conductor for the bonding jumper to a receptacle on a 20A branch circuit?

...


More Code Q&As
 



Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 2, 2012 7:54 PM

What's Wrong Here?

Jan 19, 2012 4:06 PM

What's Wrong Here?

Jan 5, 2012 11:53 AM

View all What's Wrong Here?

product spotlight

Labeling tool

Feb 10, 2012 7:58 AM

Labeling tool

The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M TV

Arlington CP9000

Arlington's new 9" diameter ceiling cover plate is the neatest way to cover unused "high hat" cans. With no tools needed, installation couldn't be faster!...

Arlington Gangable Boxes

Designed for new or retrofit applications, these snap-together gangable plastic boxes eliminate the need to construct a multiple-gang steel box out of several individual ones...

Understanding NEC Requirements for Solar Photovoltaic Systems
During this session, Mike Holt will address possible conflicts or confusing NEC requirements, provide tips on proper electrical installation techniques, and discuss the dangers related to improper installations. View this On Demand Webinar!



resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues