What's Wrong Here?

Sep 24, 2009 1:13 PM, Brian J. McPartland, NEC Consultant

Hint: Is that really Romex?

Isn't this beautiful? In this photo, we see a temporary wiring setup where the installer apparently fabricated some cable assemblies with plug caps for that purpose. As given in 334.10(A)(1), Type NM cable (Romex) may be used "for both exposed and concealed work in normally dry locations except as prohibited by 334.10(3)." Here, the use of Type NM cable outdoors at this temporary wiring installation is a clear violation of 334.10(A)(1), simply because such a location cannot be construed as being "normally dry."

An additional concern about this installation is related to the fact that the installer fabricated these temporary wiring cables with plug caps. Although such fabrication is not prohibited by the rules given for temporary wiring in Art. 590, other rules governing the use of the specific wiring methods must also be satisfied, which was not done in this case. The manner in which the plug caps are installed is questionable, at best. It seems as if this is a violation of 110.12, which requires that "electrical equipment shall be installed in a neat and workmanlike manner." This rule has been interpreted in the past to apply to the assembly of electrical equipment as well as the installation of the equipment.

It should be noted that while not prohibited, use of homemade assemblies such as these should be minimized and employed only as a last resort. There are many different types of commercially available temporary wiring cables that are listed for this specific purpose. And while not prohibited by the NEC, it should be noted that the Occupational Safety and Health Administration (OSHA) would consider the use of homemade temporary wiring cables a violation of the Electrical Design Safety Standard. In general, OSHA requires that where a listed version of any product exists, the listed product must be used. That requirement is more restrictive than the NEC's rules on the use of listed equipment for temporary wiring. The only item specifically required to be listed in Art. 590 is decorative lighting, as given in 590.5.

> Try Another Quiz

Want to use this article? Click here for options!

Code Challenge

Code Quiz

Mar 11, 2010 12:45 PM, By Steven Owen

When installing outlet boxes for wall-mounted luminaires, when can you use No. 6 screws to secure the luminaire yoke to a plaster ring?...


More Code Quizzes

Code Q&A

Mar 11, 2010 12:48 PM, By Mike Holt

Q. Can a receptacle be used as a splicing device?...


More Code Q&As
 



Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues