Aug 7, 2008 10:55 AM, By Joe Tedesco, NEC Columnist

Hint: Is it live, or is it Memorex?

How many times have you run across this situation? The question that always comes to mind is whether or not the circuit is still energized.

If it is, then we can cite 110.3 Examination, Identification, Installation, and Use of Equipment. More specifically, 110.3(A)(8) says that when judging equipment, you must evaluate the factors that contribute to the practical safeguarding of persons using or likely to come in contact with the equipment.

If the circuit is dead, because it’s been abandoned in place, this raises a separate question. Although the NEC doesn’t specifically address abandoned wiring, the electrical fire safety section 3-2.4 in NFPA 1, Fire Prevention Code does. It calls for the tagging of permanent wiring abandoned in place at its termination and junction points or removal from all accessible areas and insulated from contact with other live electrical wiring or devices. If the NEC adopted this requirement, just think of the extra cash you could pocket when you sold the material to the scrap yard.

> Try Another Quiz

Want to use this article? Click here for options!

Code Challenge

Code Quiz

Nov 5, 2009 5:24 PM, By Steven Owen

What are the minimum and maximum lengths permitted for the grounding conductor on network-powered broadband communications systems network interface units that contain protectors?...


More Code Quizzes

Code Q&A

Nov 5, 2009 5:30 PM, By Mike Holt

When are tamper-resistant receptacles required?...


More Code Q&As
 


Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Nov 5, 2009 11:50 AM

What's Wrong Here?

Oct 22, 2009 11:16 PM

What's Wrong Here?

Oct 8, 2009 3:32 PM

View all What's Wrong Here?

product of the week

Video camera scopes

November 16, 2009

Video camera scopes

View all 2009 Products of the Week

Recent Comments

More...


EC&M TV

Exterior Fixture Box for Brick or Stone

Installing a fixture box in a brick or stone wall just got easier with Arlington’s new adjustable depth box!

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight in only 2-1/2 hours with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar. The agenda is packed with valuable information that focuses on installation tips!

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues