Jul 17, 2008 11:24 PM, By Joe Tedesco, NEC Columnist

Hint: Upgrade equals disaster

”We were asked to do a load test on a standby generator,” says Paul Ryan of Paul A. Ryan, Inc., Wicomico Church, Va. “I ended up making a jaw-dropping discovery.”

“This service upgrade was made approximately eight years ago. They converted a 320A overhead feed to a 600A underground feed with a pedestal-mounted CT cabinet. Rather than change the service conductors, they used the old wall-mounted meter pan and cover (with a plastic meter blank) as a J-box. To make matters worse, the old overhead mast was unbolted and left loose from the top of the meter pan, allowing rain water to cascade over the connections within. An antenna guide wire was even tied to the top of the mast.

“With only one wall strap keeping the mast upright, every time the wind blew, the abandon mast conductors pushed on the hot conductors in the meter pan. If you look to the left, you’ll see where one of the split bolt legs blew a hole through the cover.

“After bringing this to the attention of building manager, we were contracted to correct this mess of violations. We left it Code compliant, of course.”

I can’t find anything here that would allow this to be done. Section 110.3 focuses on the examination, identification, installation, and use of equipment.

110.3(A) states, “In judging equipment, considerations such as the following shall be evaluated:”

  1. “Suitability for installation and use in conformity with the provisions of this Code FPN: Suitability of equipment use may be identified by a description marked on or provided with a product to identify the suitability of the product for a specific purpose, environment, or application. Suitability of equipment may be evidenced by listing or labeling.
  2. ”Mechanical strength and durability, including, for parts designed to enclose and protect other equipment, the adequacy of the protection thus provided
  3. ”Wire-bending and connection space
  4. ”Electrical insulation
  5. ”Heating effects under normal conditions of use and also under abnormal conditions likely to arise in service
  6. ”Arcing effects
  7. ”Classification by type, size, voltage, current capacity, and specific use
  8. ”Other factors that contribute to the practical safeguarding of persons using or likely to come in contact with the equipment”
110.3(B) states, “Listed or labeled equipment shall be installed and used in accordance with any instructions included in the listing or labeling.”

I also believe that abandoned wiring of all types should be removed.

> Try Another Quiz

Want to use this article? Click here for options!

Code Challenge

Code Quiz

Mar 11, 2010 12:45 PM, By Steven Owen

When installing outlet boxes for wall-mounted luminaires, when can you use No. 6 screws to secure the luminaire yoke to a plaster ring?...


More Code Quizzes

Code Q&A

Mar 11, 2010 12:48 PM, By Mike Holt

Q. Can a receptacle be used as a splicing device?...


More Code Q&As
 



Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

Panelboard

March 8, 2010

Panelboard

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues