Kim Schneider, of Kim Schneider Electrical Contracting, Chalfont Pa., found this while inspecting a large catering hall located in Bucks County, Pa. “Within a minute of being in the facility, I found fire extinguishers that had not been inspected since 1998, not one emergency light was working, and this electrical junction box,” says Schneider. “This is just the beginning of a very large list of incompetent work performed in this building.”

The service entrance cable was frayed, damaged, not protected from physical damage, and in direct contact with the earth. The service cable supplying power to the existing outbuilding was installed without any electrical connectors and was not properly grounded and bonded. The open electrical junction box, with exposed live wires and improper connections, was located behind the boiler located in the basement. Unqualified persons installed the 3-phase panel without any permits.

For a few specific rule violations we should start with a review of 90.1.

As per 90.1(A), “The purpose of this Code is the practical safeguarding of persons and property from hazards arising from the use of electricity.

90.1(B) goes on to state, “This Code contains provisions that are considered necessary for safety. Compliance therewith and proper maintenance results in an installation that is essentially free from hazard but not necessarily efficient, convenient, or adequate for good service or future expansion of electrical use. FPN: Hazards often occur because of overloading of wiring systems by methods or usage not in conformity with this Code. This occurs because initial wiring did not provide for increases in the use of electricity. An initial adequate installation and reasonable provisions for system changes provide for future increases in the use of electricity.”

As per 110.2, “The conductors and equipment required or permitted by this Code shall be acceptable only if approved.

In addition, 110.3 focuses on the examination, identification, installation, and use of equipment. Many of the requirements in this section were not met on this installation.

Additional violations can be noted in the areas of improper grounding and bonding, exposed live wires, box fill, junction box use, and wiring methods.

> Try Another Quiz

Want to use this article? Click here for options!

Code Challenge

Code Quiz

Mar 11, 2010 12:45 PM, By Steven Owen

When installing outlet boxes for wall-mounted luminaires, when can you use No. 6 screws to secure the luminaire yoke to a plaster ring?...


More Code Quizzes

Code Q&A

Mar 11, 2010 12:48 PM, By Mike Holt

Q. Can a receptacle be used as a splicing device?...


More Code Q&As
 



Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues