Hint: Miswired motor
This motor came with a flexible cord and cap. Someone made splices to the leads outside the motor terminal housing and just wrapped it up with electrical tape. The Code requires you to splice or join conductors with splicing devices identified for the use. Then, you must cover all splices and joints (and any free ends of conductors) with insulation equivalent to that of the conductors, or with an insulating device identified for the purpose. The NEC does not recognize this taped splice (out in the open) as an acceptable installation, unless you use it during temporary wiring as covered by 590.4(G) and 400.9.
Want to use this article? Click here for options!
© 2012 Penton Media, Inc.
Code Challenge
Code Quiz
May 10, 2012 12:29 PM, By Steven Owen, National Code Seminars
When installing a shielded cable or a twisted pair cable in a Class I, Division 1 location where a cable seal is required, when is it not required to remove the shielding material or separate the twisted pairs of those type cables?...
More Code Quizzes
Code Q&A
May 24, 2012 10:42 AM, By Mike Holt, NEC Consultant
Q. What labeling does the Code require in regard to arc flash hazard warning?...
More Code Q&As
Acceptable Use Policy blog comments powered by Disqus
advertisement
what's wrong here?
What's Wrong Here?
May 10, 2012 12:44 PM
View all What's Wrong Here?
What's Wrong Here
Sponsored By:
product spotlight
EV charger tester
May 25, 2012 8:26 AM
The Electrician is portable tester that verifies critical power and safety requirements of electric vehicle (EV) chargers...
View all 2012 Product Spotlights
Free Product Info
Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.