Mar 23, 2005 9:41 AM, By Joe Tedesco
Answer:
Hint: Maybe the electrician was in a hurry to get temporary power to this building.
Reader Doug Kidd of Kincaid*Bryant, in Lynchburg, Va., found this installation recently while designing a chiller replacement at a state college. The original installation was part of a major building renovation in 1985. The design included a 2,000A high-pressure contact main switch in the switchboard as the building service disconnect.
Aside from this, the electrician had only installed three parallel sets of 500 kcmil as the service lateral, per the design specifications.
Kidd advised the Owner to immediately replace the so-called fuses and included adding a new service lateral to the design.
Want to use this article? Click here for options!
© 2012 Penton Media, Inc.
Code Challenge
Code Quiz
Feb 2, 2012 9:02 PM, By Steven Owen
When installing audio distribution cables exposed on the surface of ceilings and sidewalls, the cables shall be supported by which of the following products?
- ...
More Code Quizzes
Code Q&A
Feb 2, 2012 8:58 PM, By Mike Holt
Q. Is it acceptable to use a 14 AWG conductor for the bonding jumper to a receptacle on a 20A branch circuit?
...
More Code Q&As
Acceptable Use Policy blog comments powered by Disqus
advertisement
product spotlight
Labeling tool
Feb 10, 2012 7:58 AM
The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...
View all 2012 Product Spotlights
Free Product Info
Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.