Hint: A shining example of poor construction
This walkway lighting system must have been installed by someone who was not familiar with the accepted methods used in the electrical industry. Open nonmetallic conduit of this type with energized and exposed supply conductors shows no knowledge of electrical safety or Code requirements.
Underground sections of conduit buried to proper depths (according to 300.5) and extended into the bottom of the pole (where the splices will be accessible) would have been the proper way to supply this lighting unit. See 410.30(B) for a list of the six requirements that must be met when installing metal poles to support luminaires (i.e., lighting fixtures) and serve as a raceway to enclose supply conductors.
Want to use this article? Click here for options!
© 2009 Penton Media, Inc.
Code Challenge
Code Quiz
Nov 5, 2009 5:24 PM, By Steven Owen
What are the minimum and maximum lengths permitted for the grounding conductor on network-powered broadband communications systems network interface units that contain protectors?...
More Code Quizzes
Acceptable Use Policy blog comments powered by Disqus
advertisement
what's wrong here?
|
What's Wrong Here?Nov 5, 2009 11:50 AM |
|
What's Wrong Here?Oct 22, 2009 11:16 PM |
|
What's Wrong Here?Oct 8, 2009 3:32 PM |
View all What's Wrong Here?
What's Wrong Here
Sponsored By: