What’s Wrong Here?
May 25, 2011 10:24 AM, By Joe Tedesco, NEC Consultant
Can you identify the Code violation(s) in this photo?
How well do you know the Code? Think you can spot violations the original installer either ignored or couldn’t identify? Here’s your chance to moonlight as an electrical inspector and second-guess someone else’s work from the safety of your living room or office. Can you identify the Code violation(s) in this photo?
Hint: What’s missing?
‘Tell Them What They’ve Won...’
Using the 2011 NEC, correctly identify the Code sections that show violation(s) in this month’s photo — in 200 words or less — and you could win something to put in your toolbox. E-mail your response to joseph.tedesco@yahoo.com, and we’ll select three winners (excluding manufacturers and prior winners) at random from the correct submissions. Winners will receive a set of insulated hand tools from Ideal Industries, Inc., valued at more than $125.* The set includes 9.25-in. insulated side-cutting pliers, 10-in. insulated tongue-and-groove pliers, and a 0.25-in. 3 6-in. insulated screwdriver. (* Please allow six to eight weeks for delivery of tools.)
MARCH WINNERS
Our two winners this month include: Brian Trumble, project manager, New Energy Service, Inc., Titusville, Fla., and Fred Schlosser, owner, eWire Electric Co., Winston-Salem, NC. Here’s a short recap of the violations they noted at the base of this pole.
Metal poles can be used as raceway to enclose supply conductors, but the handhole must have a cover suitable for use in wet conditions. The missing cover violates 410.30(B)(1).
Live parts 50V or higher are not guarded, because they are outside the enclosure. The exposed conductors violate the requirements of 110.27(A)(2). Section 300.4 could also be cited, as the conductors are now unprotected and subject to physical damage.
The conduit leading up to the bell box shall comply with 300.5(D)(4), which states: “Where the enclosure or raceway is subject to physical damage, the conductors shall be installed in rigid metal conduit, intermediate metal conduit, schedule 80 PVC conduit, or equivalent.” If the conduit is schedule 40 PVC, this would be a violation. Assuming the PVC is schedule 40, it is not guarded against physical damage. This is a violation of 352.12(C).
Want to use this article? Click here for options!
© 2012 Penton Media, Inc.
Code Challenge
Code Quiz
May 10, 2012 12:29 PM, By Steven Owen, National Code Seminars
When installing a shielded cable or a twisted pair cable in a Class I, Division 1 location where a cable seal is required, when is it not required to remove the shielding material or separate the twisted pairs of those type cables?...
More Code Quizzes
Code Q&A
May 24, 2012 10:42 AM, By Mike Holt, NEC Consultant
Q. What labeling does the Code require in regard to arc flash hazard warning?...
More Code Q&As
Acceptable Use Policy blog comments powered by Disqus
advertisement
what's wrong here?
What's Wrong Here?
May 10, 2012 12:44 PM
View all What's Wrong Here?
What's Wrong Here
Sponsored By:
product spotlight
EV charger tester
May 25, 2012 8:26 AM
The Electrician is portable tester that verifies critical power and safety requirements of electric vehicle (EV) chargers...
View all 2012 Product Spotlights
Free Product Info
Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.