What's Wrong Here?

Aug 1, 2010 12:00 PM, By Brian J. McPartland, NEC Consultant

Here’s your chance to moonlight as an electrical inspector and second-guess someone else’s work from the safety of your living room or office. Can you identify the Code violation(s) in this photo?

Hint: “X” marks the spot.

Tell Them What They’ve Won

Using the 2008 NEC, correctly identify the Code violation(s) in this month’s photo — in 200 words or less — and you could win something to put in your tool­box. E-mail your response to electrical.group@penton.com, and we’ll select three winners (excluding manufacturers and prior winners) at random from the correct submissions. Winners will receive a set of insulated hand tools from Ideal Industries, Inc., valued at more than $125. (Please allow six to eight weeks for delivery of tools.)

June Winners

This month’s winners include: John Sokolik, senior project manager, Pelican Engineering Consultants, LLC, Naples, Fla.; Darin Hultberg, electrical engineering technician, Advanced Engineering and Environmental Services, Inc., Grand Forks, N.D.; and Richard Owen, partner, Owen Electrical Contracting, Oakdale, Minn. Although these three responded quickly and accurately, almost all of the submissions that we received this month made reference to the most glaring clearance violations shown in this photo.

As noted in 230.9(A), “Service conductors installed as open conductors or multi-conductor cable without an overall outer jacket shall have a clearance of not less than 900 mm (3 ft) from windows that are designed to be opened, doors, porches, balconies, ladders, stairs, fire escapes, or similar locations.” In addition, 230.9(B) states, “The vertical clearance of final spans above, or within 900 mm (3 ft) measured horizontally of, platforms, projections, or surfaces from which they might be reached shall be maintained in accordance with 230.24(B).” It’s clear the service conductor is within reach of anyone who stands on this open balcony space. Section 230.24 begins with the phrase, “Service-drop conductors shall not be readily accessible.”

The communications cable below the service conductors can also be cited. As noted in 800.44(A)(4), “Supply service drops of 0-750V running above and parallel to communications service drops shall have a minimum separation of 300 mm (12 in.) at any point in the span, including the point of their attachment to the building.” The distance between the power and communications cable near the point of attachment is less than 12 in.

Although it’s difficult to see in this photo, one might also call into question the means of attachment at the building (230.27) and the mounting supports used (230.51) for support of the service-drop conductor.

Want to use this article? Click here for options!

Code Challenge

Code Quiz

May 10, 2012 12:29 PM, By Steven Owen, National Code Seminars

When installing a shielded cable or a twisted pair cable in a Class I, Division 1 location where a cable seal is required, when is it not required to remove the shielding material or separate the twisted pairs of those type cables?...


More Code Quizzes

Code Q&A

May 24, 2012 10:42 AM, By Mike Holt, NEC Consultant

Q. What labeling does the Code require in regard to arc flash hazard warning?...


More Code Q&As
 



Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

May 10, 2012 12:44 PM

What's Wrong Here?

Apr 19, 2012 10:09 AM

What's Wrong Here?

Apr 5, 2012 2:27 PM

View all What's Wrong Here?

product spotlight

EV charger tester

May 25, 2012 8:26 AM

EV charger tester

The Electrician is portable tester that verifies critical power and safety requirements of electric vehicle (EV) chargers...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M Whitepaper

Arc Mitigation –A Three-Step Approach

Did you know that an arc-flash incident hospitalizes 5-7 workers per day in North America, severely impacting processes and profitability with lost production? Download This Sponsored Whitepaper Today!

What's New in Residential Cabling?
Date: Wednesday, May 30, 2012
Time: 2:00pm ET


In this The Home Depot sponsored Low Voltage Webinar, Ron Kipper RCDD / NTS will discuss the need for compression style coaxial connectors and the migration of the entire CATV, Satellite and Audio / Video industry to them. Register Today!

Grounding Versus Bonding
Now Available On-Demand


In this 60-minute FREE webinar, Mike Holt of Mike Holt Enterprises, Inc. will explain the purpose of grounding and bonding as related to the most current requirements set forth in the 2011 NEC. Register to View On-Demand!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues