ECM Buyers' Guide

What's Wrong Here?


What's Wrong Here? 

Oct 8, 2004, By Joe Tedesco

Hint: The conduit and other raceway at the Park Street MBTA station in Boston is separated where passing through the sleeve to the station below....

What's Wrong Here? 

Oct 1, 2004, By Joe Tedesco, NEC Columnist

Hint: Would you like to fill up your vehicle with fuel near this installation?...

What's Wrong Here? 

Sep 23, 2004, By Joe Tedesco

Hint: Store merchants use these receptacles to light up trees along the sidewalk....

What's Wrong Here? 

Sep 8, 2004, By Joe Tedesco

Hint: The color of this conduit looks very similar to the clay pots in my garden....

What's Wrong Here? 

Sep 1, 2004, By Joe Tedesco, NEC Columnist

How well do you know the Code? ...

What's Wrong Here? 

Aug 24, 2004, By Joe Tedesco

Hint: No, the cover from this panelboard was not removed prior to taking this picture....

What's Wrong Here? 

Aug 9, 2004, By Joe Tedesco

Hint: Yes, this is energized....

What's Wrong Here? 

Aug 1, 2004, By Joe Tedesco, NEC Columnist

Hint: Is this a hallway luminaire or a receptacle in disguise?...

What's Wrong Here? 

Jul 23, 2004, By Joe Tedesco

Hint: Missing connections and so much more....

What's Wrong Here 

Jul 8, 2004, By Joe Tedesco

Hint: This equipment is located in the closet of an existing single-family dwelling....

What's Wrong Here? 

Jul 1, 2004, By Joe Tedesco, NEC Columnist

How well do you know the Code?...

What's Wrong Here? 

Jun 23, 2004, By Joe Tedesco

Hint: What isn't wrong here?...

What's Wrong Here? 

Jun 8, 2004, By Joe Tedesco

Hint: This installation was found at an industrial site....

What's Wrong Here? 

Jun 1, 2004, By Joe Tedesco, NEC Columnist

Hint: This AC supply is located in a wet location under an outdoor lift at a paper printing plant....

What's Wrong Here? 

May 21, 2004, By Joe Tedesco

Hint: Does this look like a weather-proof installation to you?...

What's Wrong Here? 

May 7, 2004, By Joe Tedesco

Hint: This device was installed many years ago and is served by aluminum wiring....

What's Wrong Here? 

May 1, 2004, By Joe Tedesco, NEC Columnist

Can you spot the Code violations?...

What's Wrong Here? 

Apr 1, 2004, By Joe Tedesco, NEC Columnist

Hint: It looks like the installer of this optical cable was extra careful not to over bend or kink this cable....

What's Wrong Here? 

Mar 1, 2004, By Joe Tedesco, NEC Columnist

How well do you know the Code? Think you can you spot violations the original installer either ignored or couldn't identify himself? Here's your chance...

What's Wrong Here? 

Feb 1, 2004, By Joe Tedesco, NEC Columnist

Hint: These flexible cords are “temporarily” being used outside on a concrete crushing site to supply various pieces of electrical equipment....

Previous | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | Next

what's wrong here?

What's Wrong Here?

Nov 5, 2009 11:50 AM

What's Wrong Here?

Oct 22, 2009 11:16 PM

What's Wrong Here?

Oct 8, 2009 3:32 PM

View all What's Wrong Here?

product of the week

Video camera scopes

November 16, 2009

Video camera scopes

View all 2009 Products of the Week

Recent Comments

More...


EC&M TV

Exterior Fixture Box for Brick or Stone

Installing a fixture box in a brick or stone wall just got easier with Arlington’s new adjustable depth box!

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight in only 2-1/2 hours with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar. The agenda is packed with valuable information that focuses on installation tips!

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues