Jun 1, 2008 12:00 PM, By Joe Tedesco, NEC Columnist

How well do you know the Code? Think you can spot violations the original installer either ignored or couldn't identify? Here's your chance to moonlight as an electrical inspector and second-guess someone else's work from the safety of your living room or office. Joe Tedesco, who has a knack for finding shoddy electrical work, did the dirty work and found this mess. Now it's your turn to identify the violation.

Hint: Cord connected



April Winners

Andrew Lemmink, an estimator/project manager with Bizcom Electric, Inc., in Cincinnati, says he's seeing a lot more of this now that the cost of CFLs have become reasonable. “The picture shows a clear violation of 590.4(F) Lamp Protection for temporary lighting installations,” says Lemmink. “The lamp shield is missing, and the bulb is damaged.”

James Irons, a plant electrical supervisor for Ocean County Utilities Authority in Cedar Run, N.J., and Jim Swift, an electrical designer with Vincent A. DiIorio, Inc., in Norwood, Mass., cited the same Code reference.

Swift also added these comments. “590.4(J) states that cable assemblies and flexible cords shall be supported in place at intervals that ensure they will be protected from physical damage. I don't think the installing contractor took the time to properly support the temporary lighting, which led to the damaged lamp.”


‘TELL THEM WHAT THEY'VE WON…’

Using the 2008 NEC, correctly identify the Code violation(s) in this month's photo — in 200 words or less — and you could win something to put in your tool-box. E-mail your response to Joe Tedesco at joetedesco@comcast.net, and he'll select three winners (excluding manufacturers and prior winners) at random from the correct submissions. Winners will receive a set of insulated hand tools from Ideal Industries, Inc. valued at more than $125.* The set includes 9.25-inch insulated side-cutting pliers, 10-inch insulated tongue-and-groove pliers, and a 0.25-inch × 6-inch insulated screwdriver.

* Please allow six to eight weeks for delivery of tools.

Want to use this article? Click here for options!

Code Challenge

Code Quiz

Nov 5, 2009 5:24 PM, By Steven Owen

What are the minimum and maximum lengths permitted for the grounding conductor on network-powered broadband communications systems network interface units that contain protectors?...


More Code Quizzes

Code Q&A

Nov 5, 2009 5:30 PM, By Mike Holt

When are tamper-resistant receptacles required?...


More Code Q&As
 


Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Nov 5, 2009 11:50 AM

What's Wrong Here?

Oct 22, 2009 11:16 PM

What's Wrong Here?

Oct 8, 2009 3:32 PM

View all What's Wrong Here?

product of the week

Video camera scopes

November 16, 2009

Video camera scopes

View all 2009 Products of the Week

Recent Comments

More...


EC&M TV

Exterior Fixture Box for Brick or Stone

Installing a fixture box in a brick or stone wall just got easier with Arlington’s new adjustable depth box!

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight in only 2-1/2 hours with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar. The agenda is packed with valuable information that focuses on installation tips!

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues