Can you spot the Code violations?

How well do you know the Code? Think you can spot violations the original installer either ignored or couldn't identify? Here's your chance to moonlight as an electrical inspector and second-guess someone else's work from the safety of your living room or office. Joe Tedesco, who has a knack for finding shoddy electrical work, did the dirty work and found this mess. Now it's your turn to identify the violation.

Hint: More than three strikes here.


June Winners

Scott Bevan, P.E., LEED AP, of PAE Consulting Engineers, Portland, Ore., sent in these comments in reference to the June photo. “Per 2005 NEC Sec. 300.11(A), raceways and boxes must be securely fastened in place. The rigid nonmetallic conduit (RNC) out of the ground does not provide adequate support for the junction box as required by 314.23(E). Also, per 352.30, the RNC must be securely fastened within 3 feet of each outlet box or conduit termination. In addition, RNC is not permitted where the ambient temperature exceeds 50°C. This installation is clearly in a sunny location, which may exceed this upper limit. Finally, this installation violates 110.12, which requires work to be installed in a neat and workmanlike manner.”

In addition to noting a few of the same violations as Bevan, David Midgley, a project estimator for Walls-Carroll in Ohio, also identified the following problems:

350.12(1) — Liquidtight flexible metal conduit (uses not permitted where subject to physical damage). From what can be seen in the picture, there's no protection for the liquidtight.

352.48 — Joints. Judging by the way the PVC tilts to the side right at the coupling or bell end, I would say that this wasn't put together using an approved method.

352.44 — Expansion fittings. Because this conduit is subject to thermal expansion, an expansion fitting should be in place. It's too difficult to determine what the annual ambient temperature is. If it's Ohio, temperatures could be from -20°F to 100°F. Thus, according to Table 352.44(A), there could be an expansion of 6.08 mm per meter or greater.

Our third winner this month, Mark Trumbull, controls engineer with OFS in Sturbridge, Mass., noted many of the same violations as the first two winners.


‘TELL THEM WHAT THEY'VE WON…’

Correctly identify the Code violation(s) in this month's photo — in 200 words or less — and you could win something to put in your toolbox. E-mail your response to Joe Tedesco at joetedesco@comcast.net, and he'll select three winners (excluding manufacturers and prior winners) at random from the correct submissions. Winners will receive a set of insulated hand tools from Ideal Industries, Inc. valued at more than $125.* The set includes 9.25-inch insulated side-cutting pliers, 10-inch insulated tongue-and-groove pliers, and a 0.25-inch × 6-inch insulated screwdriver.

* Please allow six to eight weeks for delivery of tools.

Want to use this article? Click here for options!

Code Challenge

Code Quiz

Mar 11, 2010 12:45 PM, By Steven Owen

When installing outlet boxes for wall-mounted luminaires, when can you use No. 6 screws to secure the luminaire yoke to a plaster ring?...


More Code Quizzes

Code Q&A

Mar 11, 2010 12:48 PM, By Mike Holt

Q. Can a receptacle be used as a splicing device?...


More Code Q&As
 



Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues