What's Wrong Here?

Jan 1, 2007 12:00 PM, By Joe Tedesco, NEC Columnist

Answer:

Hint: Look out for those orange barrels in the sky.

Mitchell Brochu, a student at a local trade school in Philadelphia — who's been working in the field for about eight months — noted the following Code violations with the January photo: Sections 230.9(A), 230.27, 230.50(A), 230.54(A), and 230.54(F). “I hope I got it right,” says Brochu. “I could use those insulated hand tools!”

Brian N. Ferreira, an assistant estimator with Consolidated Electrical Services in Norwood, Mass., had this to say. “As for the obvious violation with the orange boot used to protect the service drop connections, I looked to Art. 230 (Services) and found the following:

“230.9 Clearances on Buildings. Service conductors and final spans shall comply with 230.9(A), (B), and (C).

“(A) Clearances. Service conductors installed as open conductors or multiconductor cable without an overall outer jacket shall have a clearance of not less than 3 ft from windows that are designed to be opened, doors, porches, balconies, ladders, stairs, fire escapes, or similar locations.

“(B) Vertical Clearance. The vertical clearance of final spans above or within 3 ft measured horizontally of, platforms, projections, or surfaces from which they might be reached shall be maintained in accordance with 230.24(B).

“I also like how they extended the service drop conductors to accommodate the lack of slack to make the connections to the service conductors. At least they didn't need a ladder to make the final connections!”

Charles Smith, an electrical development engineer in Circleville, Ohio, also cited a violation of Sec. 230.9 in this installation.

> Try Another Quiz

Want to use this article? Click here for options!

Code Challenge

Code Quiz

Mar 11, 2010 12:45 PM, By Steven Owen

When installing outlet boxes for wall-mounted luminaires, when can you use No. 6 screws to secure the luminaire yoke to a plaster ring?...


More Code Quizzes

Code Q&A

Mar 11, 2010 12:48 PM, By Mike Holt

Q. Can a receptacle be used as a splicing device?...


More Code Q&As
 



Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues