What's Wrong Here?

Oct 1, 2006 12:00 PM, By Joe Tedesco, NEC Columnist

Hint: Opening up a can of worms.

Edward P. Nescot, vice president, Western Operations, The Farfield Co., Greensburg, Pa., provided the following thoughts. “Cables are not properly supported, see Articles 300, 320, and 330 for AC and MC support within 12 inches of every box. The electrical nonmetallic tubing (ENT) is not properly supported [see 362.30(A)]. They used an improper fitting at the EMT and ENT conversion point [see 362.6]. The junction box is severely overcrowded [see 314.16(A)(1)] and has no blank cover plate [see 314.25].”

Richard Rubino, senior electrical inspector, City of Los Angeles, Lomita, Calif., offered a more detailed submission. References not overlapping with Nescot's comments include the following:

  • 300.16(A) — requires a box or fitting when there is a change — in this case from EMT to ENT.

  • 358.30 — calls for the EMT to be securely fastened in place within 3 feet of the box.

  • 362.30 — requires the ENT to be securely fastened in place at intervals not to exceed 3 feet and within 3 feet of the termination.

  • 362.10(1) and (2). If the building is more than three stories, this is a violation. And I don't see any thermal barriers.

  • 362.120 — markings not visible on approximately 6 to 8 feet of ENT (may be on the opposite side).

  • 314.23(A) — may be a violation if the box is not securely fastened to the top plate.

  • 314. 28(C) — calls for all junction boxes to be provided with a cover.

  • 320.24 — appears that the bending radius is less than five times the diameter (if this is Type AC “BX” cable) on the run closest to the bottom of the picture.

In addition to noting some of the same sections as the first two winners, John Ball, a health care electrician from Inman, S.C., added these references.

  • 110.12 — the job was not installed in a neat and workman-like manner.

  • 110.3(B) — the connection from EMT to ENT would not be listed or labeled for this purpose.

  • 110.8 — the connection from EMT to ENT would not be recognized as a suitable wiring method.

  • 300.11(A)(1) or (A)(2) — cables shall not be laid on the suspended ceiling.

  • 362.6 — ENT fitting not listed for direct connection to EMT in this installation.

> Try Another Quiz

Want to use this article? Click here for options!

Code Challenge

Code Quiz

Mar 11, 2010 12:45 PM, By Steven Owen

When installing outlet boxes for wall-mounted luminaires, when can you use No. 6 screws to secure the luminaire yoke to a plaster ring?...


More Code Quizzes

Code Q&A

Mar 11, 2010 12:48 PM, By Mike Holt

Q. Can a receptacle be used as a splicing device?...


More Code Q&As
 



Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues