ECM Buyers' Guide
 

What's Wrong Here?

Sep 1, 2006 12:00 PM, By Joe Tedesco, NEC Columnist

Hint: This receptacle is located behind a bed in a hotel guestroom.

Candi Brackett, chief engineer, Wilmington Hilton Riverside, Wilmington, Del., offered these comments. “In reference to the receptacle behind the hotel bed, the 1999 NEC [210.60 (B)] was the first edition of the Code to reference this issue. We have had many damaged in the past. The new requirement for the receptacle is that it shall be located so that the bed does not come in contact with the attachment plugs, or a suitable guard must be put in place.”

James W. Robertson, Jr., master electrician, J.E.C. Electric, Inc., Fort Wayne, Ind., added this perspective. “The main violation I see here is under 210.60(B). After adoption of the 1999 NEC, receptacles behind a bed in a hotel room shall be located such that when cords are plugged in that the bed does not make contact with them causing damage. Secondly, a suitable guard could also be installed to prevent damage for any existing receptacles as well.”

Sharon Milholen, electrical design engineer, Patterson Pump Co., Toccoa, Ga., summed it up as follows: “Per 210.60 (B) — Only after the 1999 NEC was adopted, either the bed cannot be able to touch any plug connected to the receptacle, or the receptacle must be provided with a guard. Beats me as to what a ‘suitable guard' is!”

> Try Another Quiz

Want to use this article? Click here for options!

Code Challenge

Code Quiz

Feb 2, 2012 9:02 PM, By Steven Owen

When installing audio distribution cables exposed on the surface of ceilings and sidewalls, the cables shall be supported by which of the following products?

    ...


More Code Quizzes

Code Q&A

Feb 2, 2012 8:58 PM, By Mike Holt

Q. Is it acceptable to use a 14 AWG conductor for the bonding jumper to a receptacle on a 20A branch circuit?

...


More Code Q&As
 



Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Feb 2, 2012 7:54 PM

What's Wrong Here?

Jan 19, 2012 4:06 PM

What's Wrong Here?

Jan 5, 2012 11:53 AM

View all What's Wrong Here?

product spotlight

Labeling tool

Feb 10, 2012 7:58 AM

Labeling tool

The Rhino 4200 labeling tool features one-touch “hot keys” that quickly create and format wire/cable wraps, flags, fixed-length labels and more...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M TV

Arlington CP9000

Arlington's new 9" diameter ceiling cover plate is the neatest way to cover unused "high hat" cans. With no tools needed, installation couldn't be faster!...

Arlington Gangable Boxes

Designed for new or retrofit applications, these snap-together gangable plastic boxes eliminate the need to construct a multiple-gang steel box out of several individual ones...

Understanding NEC Requirements for Solar Photovoltaic Systems
During this session, Mike Holt will address possible conflicts or confusing NEC requirements, provide tips on proper electrical installation techniques, and discuss the dangers related to improper installations. View this On Demand Webinar!



resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues