What's Wrong Here?

Mar 1, 2006 12:00 PM, By Joe Tedesco, NEC Columnist

Answer:

Hint: Interesting weep hole design.

Vernon Long, owner, Long Electrical Services LLC, Sandwich, Ill., submitted a list of five pertinent violations. “The conduit body in the photograph has been compromised for the following reasons:

“1. Violation of 110.11 — By placing the conduit body at grade level, it is subject to frequent exposure to water. If this were located in an area where snow or ice melting agents are commonly used, this would be very deleterious to ferrous metals.

“2. Violation of 110.12(C) — The hole in the cover of the conduit body will now allow water or vermin to enter the raceway system. This can cause additional damage to the raceway and equipment within the facility, possibly resulting in a catastrophic electrical fault.

“3. Violation of 300.6 — If it was necessary to install the conduit body at grade, a nonmetallic unit would have been a better choice.

“4. Violation of 314.15(A) — By not paying sufficient attention to the mounting environment of the conduit body, moisture is now entering and/or accumulating within the unit — and undoubtedly flowing further into the raceway system.

“5. Violation of 300.7 — If this installation is located in a northern climate, the corrosion could also have occurred from within the conduit body, due to the accumulation of condensation. Sealing the raceway at the interior side of the wall would have eliminated this problem.”

Jayson Ouillette, of Ashcott Electrical in Manchester, Mich., injected a little humor in his reply. “This photo suggests that the term LB might in fact be an acronym for ‘Leaky Back.’ There are several noticeable violations in this installation: reference 2005 NEC, Sections 314.15(A), 314.28(C), 314.72(C), and possibly (A) and (E). We might also consider 314.40(A) or 314.41. Perhaps the bottle to the right indicates the motive for leaving this installation as is.”

Glenn Ross, senior electrical designer, Burns and McDonnell, Kansas City, Mo., added that this installation violates the requirements of 110.27, especially section B, and 314.15(A). “If the cover wasn't damaged, it was corroded, and not corrosion resistant as specified in 314.40(A).”

> Try Another Quiz

Want to use this article? Click here for options!

Code Challenge

Code Quiz

Mar 11, 2010 12:45 PM, By Steven Owen

When installing outlet boxes for wall-mounted luminaires, when can you use No. 6 screws to secure the luminaire yoke to a plaster ring?...


More Code Quizzes

Code Q&A

Mar 11, 2010 12:48 PM, By Mike Holt

Q. Can a receptacle be used as a splicing device?...


More Code Q&As
 



Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues