What's Wrong Here?

Feb 1, 2006 12:00 PM, By Joe Tedesco, NEC Columnist

Answer:

Hint: Where is this flexible metal conduit headed?

Bart Gilbreath, an electrical design engineer with Garver Engineers, Fayetteville, Ark., submitted these comments. “The flexible metal conduit looks like it was installed underground, and into the concrete foundation. The [flexible metal conduit] FMC is also installed in a wet location (see fire sprinkler and mildew) and is located in an area subject to physical damage. These all are violations of 348.12.”

In addition to noting the same violations of 348.12, Bill Marino, a maintenance electrician with the U.S. Postal Service in Wallingford, Conn., noted that 300.5(D)(1) and (4) also deal with “protection from damage.” Rule (1) states that any direct buried circuits that emerge from grade must be protected a minimum of 2.5 meters (8 feet) above finished grade. Rule (4) states where the conductors are exposed to physical damage they shall be protected by RMC, IMC, or Schedule 80 RNMC (or equal).

Robert Henning, Jr., an electrical designer with Gatter & Diehl, Inc., Harrisburg, Pa., pointed out most of the same violations as noted above.

As per 348.12(1), FMC shall not be used in wet locations unless the conductors are approved for the specific conditions and the installation is such that liquid is not likely to enter raceways or enclosures to which the conduit is connected. Listed FMC is permitted for use in wet locations, provided the completed installation prevents water from entering enclosures or other raceways to which the conduit is connected.

For this application, the conductors must be suitable for wet locations. Listed FMC (½ inch and larger) may be installed in unlimited lengths, provided an equipment grounding conductor is installed with the circuit conductors. See 250.118(5) as well as 348.60 for specific requirements related to the use of FMC as an equipment grounding conductor. In addition, FMC shall not be used underground or embedded in poured concrete or aggregate [348.12(6)], nor where subject to physical damage [348.12(7)].

> Try Another Quiz

Want to use this article? Click here for options!

Code Challenge

Code Quiz

May 10, 2012 12:29 PM, By Steven Owen, National Code Seminars

When installing a shielded cable or a twisted pair cable in a Class I, Division 1 location where a cable seal is required, when is it not required to remove the shielding material or separate the twisted pairs of those type cables?...


More Code Quizzes

Code Q&A

May 24, 2012 10:42 AM, By Mike Holt, NEC Consultant

Q. What labeling does the Code require in regard to arc flash hazard warning?...


More Code Q&As
 



Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

May 10, 2012 12:44 PM

What's Wrong Here?

Apr 19, 2012 10:09 AM

What's Wrong Here?

Apr 5, 2012 2:27 PM

View all What's Wrong Here?

product spotlight

EV charger tester

May 25, 2012 8:26 AM

EV charger tester

The Electrician is portable tester that verifies critical power and safety requirements of electric vehicle (EV) chargers...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M Whitepaper

Arc Mitigation –A Three-Step Approach

Did you know that an arc-flash incident hospitalizes 5-7 workers per day in North America, severely impacting processes and profitability with lost production? Download This Sponsored Whitepaper Today!

What's New in Residential Cabling?
Date: Wednesday, May 30, 2012
Time: 2:00pm ET


In this The Home Depot sponsored Low Voltage Webinar, Ron Kipper RCDD / NTS will discuss the need for compression style coaxial connectors and the migration of the entire CATV, Satellite and Audio / Video industry to them. Register Today!

Grounding Versus Bonding
Now Available On-Demand


In this 60-minute FREE webinar, Mike Holt of Mike Holt Enterprises, Inc. will explain the purpose of grounding and bonding as related to the most current requirements set forth in the 2011 NEC. Register to View On-Demand!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues