Apr 1, 2005 12:00 PM, By Joe Tedesco, NEC Columnist

Answer:

Hint: This equipment is readily accessible from the standing or sitting position.

Everyone enjoys a little bathroom humor, but not at the expense of violating the NEC. Check out what our three winners this month had to say about this installation.

Gary Conway, president of CES Engineering, Inc. in Grass Valley, Calif., wrote in to say that combustibles and flammables (aerosol cans on the wireway) can't be stored in an electrical room. “Working clearance in front of the equipment does not meet 110.26 because of the toilet and coffee table,” he wrote. “Wireway cover is not properly secured. If this room had a basin, it would be defined as a bathroom.” He went on to note that if this room was located in a dwelling, the installation would violate the requirements of 240.24(E), which states “In dwelling units and guest rooms or guest suites of hotels and motels, overcurrent devices, other than supplementary overcurrent protection, shall not be located in bathrooms.”

Joseph Routhier, EIT, LEED AP, electrical engineer for Shah Smith and Associates in Houston, also identified the working clearance violation. “The minimum clear distance from Table 110.26(A)(1) should be 3 feet, per Condition 2,” he wrote. “I would consider a person making direct skin contact with a porcelain tank grounded. Other violations include: 110.26(B), clear spaces, working space shall not be used for storage. I'm sure the air freshener, hand soap, and console table holding the reading material would count.”

Roger Zieg, instructor for Lewellyn Technology in Linton, Ind., took a slightly different approach. “The panels are not installed in a neat manner (paint) (110.12),” he wrote. “The panel above the table does not allow for sufficient width of working space [110.26(A)(2)], and the toilet paper hangers, cans, etc. violate 110.26(F), dedicated equipment space. Also, if this is a dwelling, the rule about service equipment and OCPD in bathrooms has been violated [230.70(A)(2), and 240.24(E)].”

> Try Another Quiz

Want to use this article? Click here for options!

Code Challenge

Code Quiz

Mar 11, 2010 12:45 PM, By Steven Owen

When installing outlet boxes for wall-mounted luminaires, when can you use No. 6 screws to secure the luminaire yoke to a plaster ring?...


More Code Quizzes

Code Q&A

Mar 11, 2010 12:48 PM, By Mike Holt

Q. Can a receptacle be used as a splicing device?...


More Code Q&As
 



Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues