Dec 1, 2004 12:00 PM, By Joe Tedesco, NEC Columnist

How well do you know the Code? Think you can spot violations the original installer either ignored or couldn't identify? Here's your chance to moonlight as an electrical inspector and second-guess someone else's work from the safety of your living room or office. Joe Tedesco, who has a knack for finding shoddy electrical work, did the dirty work and found this mess. Now it's your turn to identify the violation.

Hint: This 0.625-inch diameter, 8-foot ground rod electrode is connected to a water pipe clamp.

Tony Scaffidi, technical support engineer, Pieper Electric, Milwaukee, submitted this response to the photo in the December issue. “All ground clamps and fittings shall be approved for general use without protection or be protected from physical damage [250.10(1) and (2)]. Where practicable, rods, pipe, or plate electrodes shall be embedded below permanent moisture levels and free of nonconductive coatings [250.53(A)]. The rod shall be driven so that 8 feet is in contact with the earth. Since there's only a couple of inches showing over the concrete, it doesn't look like they had any trouble driving the rod in [250.53(A) and (G)]. It's hard to tell from the picture what type of conductor is used, but 250.64(A) and (B) tells us that a grounding electrode conductor shall be securely fastened to the surface on which it is carried. A 4 AWG conductor, or larger, is required to be protected from physical damage if exposed.”

In addition to citing the same violations as Scaffidi, Marc Blaine, electrician, Colgate Palmolive Co., Morristown, N. J., noted: “Grounding conductors and bonding jumpers shall be connected by listed clamps or other listed means. The clamp used in this instance is a water pipe clamp, not a recognized ground rod clamp [250.8].” He added, “250.70 covers pretty much the same subject indicated in 250.8, but also notes ‘Ground clamps …, where used on pipe, rod, or other buried electrodes, shall also be listed for direct soil burial or concrete encasement.’ The plated steel screws used to make the conductor connection and maintain the grip of the two clamp halves on the electrode often rust through over time, creating a poor (high resistance) connection. A ground rod clamp (acorn) is made of non-corroding material, which is why it gets the UL Listing for this application and the water pipe clamp doesn't.”

Bob O'Brien, project manager, Riggs Distler & Co., Inc., Sharon Hill, Pa., also identified a combination of violations noted by the two other December winners.

Want to use this article? Click here for options!

Code Challenge

Code Quiz

Nov 5, 2009 5:24 PM, By Steven Owen

What are the minimum and maximum lengths permitted for the grounding conductor on network-powered broadband communications systems network interface units that contain protectors?...


More Code Quizzes

Code Q&A

Nov 5, 2009 5:30 PM, By Mike Holt

When are tamper-resistant receptacles required?...


More Code Q&As
 


Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Nov 5, 2009 11:50 AM

What's Wrong Here?

Oct 22, 2009 11:16 PM

What's Wrong Here?

Oct 8, 2009 3:32 PM

View all What's Wrong Here?

product of the week

Video camera scopes

November 16, 2009

Video camera scopes

View all 2009 Products of the Week

Recent Comments

More...


EC&M TV

Exterior Fixture Box for Brick or Stone

Installing a fixture box in a brick or stone wall just got easier with Arlington’s new adjustable depth box!

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight in only 2-1/2 hours with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar. The agenda is packed with valuable information that focuses on installation tips!

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues