What's Wrong Here?

Jun 10, 2003 12:00 PM

As per the requirements of 230.24(B), Vertical Clearance from Ground, “Service-drop conductors, where not in excess of 600V, nominal, must have the following minimum clearance from final grade: (1) 3.0 m (10 ft) — at the electric service entrance to buildings, also at the lowest point of the drip loop of the building electric entrance, and above areas or sidewalks accessible only to pedestrians, measured from final grade or other accessible surface only for service-drop cables supported on and cabled together with a grounded bare messenger where the voltage does not exceed 150V to ground.”

Want to use this article? Click here for options!

product of the week

Thermal imaging software

November 17, 2008 10:26 AM

Fluke SmartView Version 2.0

View all 2008 Products of the Week

Recent Comments

Follow comments on ecmweb.com




Arc Flash Conferences   Code Change Conferences

Professionals provide answers to your questions.



Do you have any technical paper explaining IBC?

iGard Resistance Grounding Q&A BookletDownload the Resistance Grounding Q&A Booklet
I-Gard
EC&M TV

Arlington Indoor InBox

Easy install makes Indoor InBox preferred for power & low voltage applications. Furniture and appliances stay close to the wall!...

Listen
"Sizing Gen-Sets: Facts, Hints, and Good Judgment"
Listen
Sponsored By:

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Back to Top

Browse Back Issues

Browse Back Issues