ECM Buyers' Guide
Email   Facebook   Digg   Twitter   More     (0)   

What's Wrong Here?

Apr 1, 2003 12:00 PM, By Joe Tedesco, NEC Columnist

Hint: These two receptacles serve clothes dryers located in a hotel laundry room.

Electrical Technology Level 3 students Brett Stratton, Jason Landry, Michael Schwinn, and Steven Raymond from the Pinkerton Academy, Derry, N.H., sent in the following correct response. We always thought EC&M could come in handy in the classroom.

“If the wires are under-sized for the dryers, and they appear to be, they're in violation of 220.18, which requires the installer to calculate the load based on 5,000W or the nameplate rating on the dryer, whichever is larger. In addition, the size of the junction box is woefully undersized for the conductors, which should contain 12 10 AWG wires, according to 314.16(A). The other problem that's evident from the picture is that the dryers are equipped with a 3-wire cord. If they've been installed recently and aren't located in a mobile home or a recreational vehicle, then they're in violation of 250.140, which requires the use of a 4-wire connection to the outlet.

“There also appears to be some kind of funky grounding wire externally attached to the outlet on the right. Who knows what this was designed for?”

> Try Another Quiz

Want to use this article? Click here for options!

Code Challenge

Code Quiz

Mar 11, 2010 12:45 PM, By Steven Owen

When installing outlet boxes for wall-mounted luminaires, when can you use No. 6 screws to secure the luminaire yoke to a plaster ring?...


More Code Quizzes

Code Q&A

Mar 11, 2010 12:48 PM, By Mike Holt

Q. Can a receptacle be used as a splicing device?...


More Code Q&As
 



Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues