ECM Buyers' Guide
Email   Facebook   Digg   Twitter   More     (0)   

What's Wrong Here?

Oct 1, 2002 12:00 PM, By Joe Tedesco, NEC Columnist

Hint: A pavement contractor installed this Schedule 40 RNMC beneath a city street. It was joined together with a larger size sleeve of the same material.

The following individuals correctly identified the Code violations shown in the October column: Cindy Stellmack, facilities electrical engineer, Lockheed Martin, Owego, N.Y.; Paul Bazil, P.E., electrical engineer, U.S. Coast Guard, Civil Engineering Unit, Cleveland; and Michael Doberdruk, P.E., senior electrical engineer, Richard L. Bowen & Associates, Architects & Engineers, Cleveland.

Each winner noted the following violations. The cover used in this street installation is inadequate. For conductors energized to 600V, NEC Table 300.5 requires a minimum cover of 24 in. Those energized at more than 600V require a cover of 30 in. (300.50). In addition, the backfill in the trench is unsuitable for this installation [300.5(F)]. RNMC and associated fittings must be listed and installed in accordance with 352.48 and 352.6.

> Try Another Quiz

Want to use this article? Click here for options!

Code Challenge

Code Quiz

Mar 11, 2010 12:45 PM, By Steven Owen

When installing outlet boxes for wall-mounted luminaires, when can you use No. 6 screws to secure the luminaire yoke to a plaster ring?...


More Code Quizzes

Code Q&A

Mar 11, 2010 12:48 PM, By Mike Holt

Q. Can a receptacle be used as a splicing device?...


More Code Q&As
 



Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

Whats Wrong Here?

Mar 11, 2010 12:54 PM

What's Wrong Here?

Feb 18, 2010 5:04 PM

What's Wrong Here?

Feb 4, 2010 5:06 PM

View all What's Wrong Here?

product of the week

CAD Software

March 15, 2010

CAD Software

View all 2010 Products of the Week

Shocking Stats

54
More Industry Statistics

Recent Comments

More...




Professionals provide answers to your questions. Become an expert!


EC&M TV

Arlington CED1 Entrance Hoods

The Scoop Series CED Entrance Plates and Hoods are reversible, non-metallic, single and two-gang versions...

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar!

George Brown College

Online Tech Training – Electronics, PLC, and Robotics programs at George Brown College.

 

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues