Jun 5, 2008 1:15 PM, By Joe Tedesco, NEC Columnist

Hint: No, those are not pool pump hoses.

Timothy Thomas, manager/chief inspector, Commonwealth Electrical Inspection Service, Inc., New York State, couldn’t believe it when he saw this one. “They did not even call for a stake out,” says Thomas.

Was the required warning ribbon in place when the digging began for this pool or not? There are several requirements of 300.5 (Underground Installations) that are worth taking note of for this particular installation.

  • 300.5(A) Minimum Cover Requirements. “Direct-buried cable or conduit or other raceways shall be installed to meet the minimum cover requirements of Table 300.5.”
  • 300.5(D) Protection from Damage. “Direct-buried conductors and cables shall be protected from damage in accordance with 300.5(D)(1) through (D)(4).”
  • 300.5(D)(1) Emerging from Grade. “Direct-buried conductors and cables emerging from grade and specified in columns 1 and 4 of Table 300.5 shall be protected by enclosures or raceways extending from the minimum cover distance below grade required by 300.5(A) to a point at least 2.5 m (8 ft) above finished grade. In no case shall the protection be required to exceed 450 mm (18 in.) below finished grade.”
  • 300.5(D)(2) Conductors Entering Buildings. “Conductors entering a building shall be protected to the point of entrance.”
  • 300.5(D)(3) Service Conductors. “Underground service conductors that are not encased in concrete and that are buried 450 mm (18 in.) or more below grade shall have their location identified by a warning ribbon that is placed in the trench at least 300 mm (12 in.) above the underground installation.”
  • 300.5(D)(4) Enclosure or Raceway Damage. “Where the enclosure or raceway is subject to physical damage, the conductors shall be installed in rigid metal conduit, intermediate metal conduit, Schedule 80 PVC conduit, or equivalent.”

> Try Another Quiz

Want to use this article? Click here for options!

Code Challenge

Code Quiz

May 10, 2012 12:29 PM, By Steven Owen, National Code Seminars

When installing a shielded cable or a twisted pair cable in a Class I, Division 1 location where a cable seal is required, when is it not required to remove the shielding material or separate the twisted pairs of those type cables?...


More Code Quizzes

Code Q&A

May 24, 2012 10:42 AM, By Mike Holt, NEC Consultant

Q. What labeling does the Code require in regard to arc flash hazard warning?...


More Code Q&As
 



Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

May 10, 2012 12:44 PM

What's Wrong Here?

Apr 19, 2012 10:09 AM

What's Wrong Here?

Apr 5, 2012 2:27 PM

View all What's Wrong Here?

product spotlight

EV charger tester

May 25, 2012 8:26 AM

EV charger tester

The Electrician is portable tester that verifies critical power and safety requirements of electric vehicle (EV) chargers...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M Whitepaper

Arc Mitigation –A Three-Step Approach

Did you know that an arc-flash incident hospitalizes 5-7 workers per day in North America, severely impacting processes and profitability with lost production? Download This Sponsored Whitepaper Today!

What's New in Residential Cabling?
Date: Wednesday, May 30, 2012
Time: 2:00pm ET


In this The Home Depot sponsored Low Voltage Webinar, Ron Kipper RCDD / NTS will discuss the need for compression style coaxial connectors and the migration of the entire CATV, Satellite and Audio / Video industry to them. Register Today!

Grounding Versus Bonding
Now Available On-Demand


In this 60-minute FREE webinar, Mike Holt of Mike Holt Enterprises, Inc. will explain the purpose of grounding and bonding as related to the most current requirements set forth in the 2011 NEC. Register to View On-Demand!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues