Benedikt A. Goebel, project manager for a Chicago area contractor, found this unique installation while completing an office building renovation in the Chicago area. While the plumber was excavating for new risers, he came across some electrical feeders in terra cotta "conduit." Believe it or not, someone (hopefully a long time ago) pulled not one, not two, but three different feeders that ranged in size from 100A to 225A through the existing drain system. At the time these feeders were found, they were hot and supplying a well pump and some mechanical equipment in the building. Eventually the feeders were relocated and installed per current NEC requirements.

This drain pipe wasn’t designed to be used in this manner. Sec. 300.5(A) discusses minimum cover requirements for various electrical conduits permitted by Chapter 3. "Cover" is defined as the shortest distance measured between a point on the top surface of any direct-buried conductor, cable, conduit, or other raceway and the top surface of finished grade, concrete, or similar cover. Any direct-buried cable or conduit or other raceways is required to be installed to meet the minimum cover requirements of Table 300.5.

If these conductors were service cables, additional requirements come into play, such as those listed in 230.8, 230.32, and 230.49.

Want to use this article? Click here for options!



Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

Nov 5, 2009 11:50 AM

What's Wrong Here?

Oct 22, 2009 11:16 PM

What's Wrong Here?

Oct 8, 2009 3:32 PM

View all What's Wrong Here?

product of the week

LED light engine

November 2, 2009

LED light engine

View all 2009 Products of the Week

Recent Comments

More...


EC&M TV

Exterior Fixture Box for Brick or Stone

Installing a fixture box in a brick or stone wall just got easier with Arlington’s new adjustable depth box!

Southwire's 2009 Cable Innovation Road Show

Gain years worth of insight in only 2-1/2 hours with Southwire’s 2009 Cable Innovation Road Show with Grounding Seminar. The agenda is packed with valuable information that focuses on installation tips!

Listen
Sizing Gen-Sets: Facts, Hints, and Good Judgment
Listen

The complexities of today’s commercial or industrial facility, with their equipment environment of linear and nonlinear loads, places a whole new light on sizing engine-generator sets.

Arc Mitigation - A Total System Approach
There’s no question the risk of arc flash hazards is real in the electrical industry. What many don’t always realize is the impact in business interruption from such events typically far outweighs the physical damage to equipment. View this On Demand Webinar!

Implementing an Industrial Ethernet Infrastructure that's Built to Last
This webinar explores the key benefits of implementing a robust complete, end-to-end Industrial Ethernet solution – from cabling and connectivity, to active components and associated hardware. View this On Demand Webinar!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

rss icon

rss

Browse Back Issues

Browse Back Issues