What's Wrong Here
Jul 8, 2004 1:22 PM, By Joe Tedesco
If you look closely, you can see an electrical panel hiding behind the copper piping system. The panel is now inaccessible. It’s hard to believe that the heat and plumbing system passed inspection – or did it?
This installation violates working space rules as noted in 110.26 (Spaces About Electrical Equipment) of the 2002 NEC, which states “Sufficient access and working space shall be provided and maintained about all electric equipment to permit ready and safe operation and maintenance of such equipment.”
Sec. 110.26(A) (Working Space) goes on to state, “Working space for equipment operating at 600V, nominal, or less to ground and likely to require examination, adjustment, servicing, or maintenance while energized shall comply with the dimensions of 110.26(A)(1), (2), and (3) or as required or permitted elsewhere in this Code.”
blog comments powered by Disqus
Want to use this article? Click here for options!
© 2008 Penton Media, Inc.
advertisement
product of the week
Thermal imaging software
November 17, 2008 10:26 AM
View all 2008 Products of the Week
Follow comments on ecmweb.com