Illustrated Catastrophes

More Code catastrophes uncovered and corrected in these faulty installations

Whoever performed this installation must not have even known that the NEC has rules for temporary wiring.

While it's true that, by necessity, the NEC rules for temporary wiring are not nearly as strict as those for permanent installations, there are still rules. One that's been violated here is the concern for “protection” of the conductors. Section 590.4(H) states, “Flexible cords and cables shall be protected from accidental damage. Sharp corners and projections shall be avoided. Where passing through doorways or other pinch points, protection shall be provided to avoid damage.”

Although that wording doesn't specifically prohibit the temporary wiring from being strung across this staircase, the basic requirement to essentially route and locate the cables so as to prevent damage has not been satisfied — therein lies the problem. It seems pretty clear that people traveling up and down those stairs are going to (at some point) come in contact with the cables and either pull the conductors apart or trip and injure themselves. A little bit of common sense can go a long way toward providing a safer working environment for job-site personnel, not to mention offering a modicum of legal protection for the installer.

Another problem is the means of support — or lack thereof. Part (J) of 590.4 says, “Cable assemblies and flexible cords shall be supported at intervals that ensure that they will be protected from physical damage. Support shall be in the form of staples, cable ties, straps or similar fittings installed so as to not cause damage. Vegetation shall not be used for support of overhead spans of branch circuits or feeders.”

In this case, the installer failed to support the conductors in manner that will prevent damage, which is a violation. In addition, although not visible, the installer used electrician's tape as a means of support. Tape is not specifically identified, and it doesn't seem to me that tape is a “similar fitting,” as required by the wording of this rule.

We know the wording of 90.3 provides guidelines on “which rules apply when.” As this section states, “This Code is divided into the introduction and nine chapters, as shown in Fig. 90.3. Chapters 1, 2, 3, and 4 apply generally; Chapters 5, 6, and 7 apply to special occupancies, special equipment, or other special conditions. These latter chapters supplement or modify the general rules. Chapters 1 though 4 apply except as amended by Chapter 5, 6, and 7.” With the foregoing in mind, one can immediately see that the rule of 110.12, “Mechanical Execution of Work,” must be satisfied. Here, the Code says, “Electrical equipment shall be installed in a neat and workmanlike manner.” No one in their right mind would characterize this knotted mess of cables as “neat and workmanlike.”


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

May 10, 2012 12:44 PM

What's Wrong Here?

Apr 19, 2012 10:09 AM

What's Wrong Here?

Apr 5, 2012 2:27 PM

View all What's Wrong Here?

product spotlight

EV charger tester

May 25, 2012 8:26 AM

EV charger tester

The Electrician is portable tester that verifies critical power and safety requirements of electric vehicle (EV) chargers...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M Whitepaper

Arc Mitigation –A Three-Step Approach

Did you know that an arc-flash incident hospitalizes 5-7 workers per day in North America, severely impacting processes and profitability with lost production? Download This Sponsored Whitepaper Today!

What's New in Residential Cabling?
Date: Wednesday, May 30, 2012
Time: 2:00pm ET


In this The Home Depot sponsored Low Voltage Webinar, Ron Kipper RCDD / NTS will discuss the need for compression style coaxial connectors and the migration of the entire CATV, Satellite and Audio / Video industry to them. Register Today!

Grounding Versus Bonding
Now Available On-Demand


In this 60-minute FREE webinar, Mike Holt of Mike Holt Enterprises, Inc. will explain the purpose of grounding and bonding as related to the most current requirements set forth in the 2011 NEC. Register to View On-Demand!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues