Illustrated Catastrophes


As usual, never consider the following commentary associated with these photos as a formal interpretation of the National Electrical Code (NEC). Without criticizing anyone or any product, the following scenarios present us with serious safety questions.




SHODDY SIGN WIRING

An electrician secured an electrical permit to install a time clock for this new sign. The circuit leading up to the base of the sign was there prior to this installation and had been used to feed an older sign in the same location. Although the electrician had only contracted with the property owner to install the time clock, the permit still covered the entire circuit. The company that installed the new sign may have hooked it up in this manner, but the authority having jurisdiction (AHJ) figured the best way to resolve the situation was to fail the job. The installation violates the requirements of 600.5(C)(1), (C)(2), and (C)(3).




BARREL OF FUN

This empty bucket serves as a junction box for some wiring that feeds a sign and some light poles at a hospital. The installer needed power to supply a new emergency entrance sign, so he decided to notch the top of a 2-in. conduit and pull the wires out to feed the sign. This method isn't a recognized installation practice per the NEC and violates several rules, starting with 110.2 and 110.3.




PLUMBING FIXTURE?

This copper “water pipe” runs to a forming shell and encloses the cord used to supply an underwater luminaire in an East Windsor, Conn., hotel's permanently installed swimming pool. Whenever you install metal conduit to supply a pool light, you must follow the requirements of 680.23(B)(2), which call for brass or other approved corrosion-resistant metal. In addition, this “deck” box is also a violation because it isn't listed or labeled for the purpose. If it isn't equipped with threaded entries or hubs, it must be of a nonmetallic hub listed for the purpose. In addition, it must be composed of copper, brass, suitable plastic, or another approved corrosion-resistant material, and be provided with electrical continuity between every connected metal conduit and the grounding terminals by means of copper, brass, or another approved corrosion-resistant metal integral with the box (680.24).




PAST ITS PRIME

It would be an understatement to say this meter socket enclosure is showing signs of old age. It seems inevitable that the meter, which was recently replaced, will eventually fall out, exposing live wires. What the installer of this unit forgot to note was the requirements of 312.2, which instruct you to use weatherproof meter socket enclosures in wet locations. In addition, 300.6 requires you to apply an approved system of organic coatings to boxes or cabinets, which must also be marked “Raintight,” “Rainproof,” or “Outdoor Type,” if they will be used in outdoor applications.


Want to use this article? Click here for options!





Acceptable Use Policy
blog comments powered by Disqus

what's wrong here?

What's Wrong Here?

May 10, 2012 12:44 PM

What's Wrong Here?

Apr 19, 2012 10:09 AM

What's Wrong Here?

Apr 5, 2012 2:27 PM

View all What's Wrong Here?

product spotlight

EV charger tester

May 25, 2012 8:26 AM

EV charger tester

The Electrician is portable tester that verifies critical power and safety requirements of electric vehicle (EV) chargers...

View all 2012 Product Spotlights

Free Product Info

Our Product Information site is the ultimate online resource for products and services offered by Advertisers featured in our Magazine. This service is provided as a quick and easy way to request Product Information online. Get FREE product information now.

Recent Comments

More...


Social Media

More ways to stay informed...

follow us on twitter

Find us on Facebook

EC&M Whitepaper

Arc Mitigation –A Three-Step Approach

Did you know that an arc-flash incident hospitalizes 5-7 workers per day in North America, severely impacting processes and profitability with lost production? Download This Sponsored Whitepaper Today!

What's New in Residential Cabling?
Date: Wednesday, May 30, 2012
Time: 2:00pm ET


In this The Home Depot sponsored Low Voltage Webinar, Ron Kipper RCDD / NTS will discuss the need for compression style coaxial connectors and the migration of the entire CATV, Satellite and Audio / Video industry to them. Register Today!

Grounding Versus Bonding
Now Available On-Demand


In this 60-minute FREE webinar, Mike Holt of Mike Holt Enterprises, Inc. will explain the purpose of grounding and bonding as related to the most current requirements set forth in the 2011 NEC. Register to View On-Demand!

resources

product info icon

product info

tradeshow icon

tradeshow

research icon

research

industry links

industry links

rss icon

rss

Browse Back Issues

Browse Back Issues